Banqiao Line (Taipei Metro)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Banqiao Line
Banqiao Line
板橋線
30px
File:Platform in Longshan Temple Station.JPG
Overview
Type Rapid transit
Locale Taipei and New Taipei,
 Republic of China (Taiwan)
Termini Ximen
Fuzhong
Stations 6
Operation
Opened December 24, 1999
Operator(s) Taipei Rapid Transit System
Character Underground
Depot(s) Nangang Depot
Tucheng Depot
Rolling stock Siemens C321 and C341 trains
3 cars per set, 2 sets per train (6 cars)
Technical
Line length 7.2 km (4.5 mi)
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail (750 volts DC)
Operating speed 80 km/h
Route map
Banqiao Line
Traditional Chinese 板橋線
Simplified Chinese 板桥线

The Taipei Metro Banqiao (Banciao) Line (Chinese: 板橋線) is a high-capacity underground line and is a major transportation route between Taipei and New Taipei. It runs from Ximen in western Taipei to Fuzhong in eastern Taipei, consisting of 6 stations and 7.2 km of track.[1] It provides through access to the Nangang and Tucheng Lines and is part of the Blue Line.

History

  • December 24, 1999: The line opened between Longshan Temple and Taipei City Hall.
  • August 31, 2000: The section between Longshan Temple and Xinpu commenced operations.
  • May 31, 2006: The section between Xinpu and Fuzhong opened.

Stations

Code Station Name Transfer Location
English Chinese
← Continues through Nangang Line
BL6 Ximen 西門 Songshan-Xindian Line Zhongzheng
Wanhua
Taipei
BL5 Longshan Temple 龍山寺 Wanhua
BL4 Jiangzicui 江子翠 Banqiao New Taipei
BL3 Xinpu 新埔
BL2 Banqiao 板橋 TRA Western Line
Taiwan High Speed Rail
Circular Line (2015)
BL1 Fuzhong
(Lin Family Mansion and Garden)
府中
(林家花園)
→ Continues through Tucheng Line

References

  1. Lua error in package.lua at line 80: module 'strict' not found.


<templatestyles src="Asbox/styles.css"></templatestyles>