Hefei Metro
Lua error in Module:Infobox at line 314: malformed pattern (missing ']'). Hefei Metro (Chinese: 合肥地铁) is a rapid transit system in Hefei currently under construction. Line 1 begun construction on 1 June 2012. First a 4.4 km test line will be the first section completed. By 2016 the test section will be reformed into the new 29 km long line 1 and opened to the public.[1] Line one is a north-south line with 25 stations.[2] Line 2, which is also under construction is scheduled to open in 2017[3] and be the first east-west subway in Hefei. It will have a length of 27 km and 22 stations.[4] Thales Saic Transport is providing the line with urban rail traffic management and CBTC systems
Line 1 will run from Hefei Railway Station to the newly developed Lake District passing though Hefei South Railway Station. A Line 1's has an investment estimate of 13 billion yuan, with the average cost of 533 million yuan / line km.[5]
References
- ↑ 1.0 1.1 合肥市轨道交通1号线工程开工建设新闻发布稿,合肥市政府网站
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 轨道2号线有望2017年试运营
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ :Lua error in package.lua at line 80: module 'strict' not found.
External links
- 合肥“地铁”经北京专家定“准”推进 (Chinese)
<templatestyles src="Asbox/styles.css"></templatestyles>