High-speed rail (HSR) in China refers to any railway in China with commercial train service at the speed of 200 km/h (124 mph) or higher as internationally recognized. By this definition, China has the world's longest HSR network with over 19,000 km (12,000 mi) of track in service as of December 2015[1] (20,380 km (12,660 mi) km if mixed railway with freight services included) which is more than the rest of the world's high-speed rail tracks combined, and a length of 16,775.5 km (10,423.8 mi) is under construction or in planning. China's high speed rail system also includes the world's longest line, the 2,298 km (1,428 mi) Beijing–Guangzhou High-Speed Railway.[2]
Since high-speed rail service in China was introduced on April 18, 2007, daily ridership has grown from 237,000 in 2007[3] to 2.49 million in 2014,[4] making the Chinese HSR network the most heavily used in the world.[5][6] Cumulative ridership had reached 2.9 billion by October 2014.[7]
The nationwide HSR network, which extends to 28 of the country's 33 provinces and regions, consists mainly of conventional track railways including upgraded mixed passenger and freight lines, newly built passenger designated lines (PDLs) and intercity lines.[8] There is also the Shanghai Maglev, the world's first high-speed commercial magnetic levitation (maglev) line, which is owned and operated by the Shanghai municipality government. Nearly all high-speed rail lines and rolling stock are owned and operated by the China Railway Corporation, the state enterprise formerly known as the Railway Ministry.
Over the past decade, the country has undergone an HSR building boom with generous funding from the Chinese government's economic stimulus program. The pace of high-speed rail expansion slowed for a period in 2011 after the removal of Chinese Railways Minister Liu Zhijun for corruption and a fatal high-speed railway accident near Wenzhou, but has since rebounded. Concerns about HSR safety, high ticket prices, low ridership, financial sustainability of high-speed rail projects and environmental impact have drawn greater scrutiny from the Chinese press.[9]
China's early high-speed trains were imported or built under technology transfer agreements with foreign train-makers including Alstom, Siemens, Bombardier and Kawasaki Heavy Industries. Chinese engineers then re-designed internal train components and built indigenous trains that can reach operational speeds of up to 380 km/h (240 mph).[10][11]
Contents
- 1 History
- 1.1 Precursor
- 1.2 Early planning
- 1.3 The "Speed Up" campaigns
- 1.4 The conventional rail v. maglev debate
- 1.5 Acquisition of foreign technology
- 1.6 Technology transfer
- 1.7 Early dedicated high-speed rail lines
- 1.8 Corruption and concerns
- 1.9 Wenzhou accident
- 1.10 Slowdown in financing and construction
- 1.11 Recovery
- 1.12 Second boom
- 2 Current HSR expansion
- 3 Track network
- 4 Service
- 5 Technology
- 6 Maglev high-speed rail
- 7 Records
- 8 See also
- 9 Notes
- 10 References
- 11 External links
History

Precursor
The earliest example of higher-speed commercial train service in China was the Asia Express, a luxury passenger train that operated in Japanese-controlled Manchuria from 1934 to 1943.[12] The steam-powered train, which ran on the Southern Manchuria Railway from Dalian to Xinjing (Changchun), had a top commercial speed of 110 km/h (68 mph) and test speed of 130 km/h (81 mph).[12] It was faster than the fastest trains in Japan at the time. After the founding of the People's Republic of China in 1949, this train model was renamed the SL-7 and was used by the Chinese Minister of Railways.
Early planning
State planning for China's current high-speed railway network began in the early 1990s. In December 1990, the Ministry of Railways (MOR) submitted a proposal to build a high-speed railway between Beijing and Shanghai to the National People's Congress.[13] At the time, the Beijing–Shanghai Railway was already at capacity, and the proposal was jointly studied by the Science & Technology Commission, State Planning Commission, State Economic & Trade Commission, and the MOR.[13] In December 1994, the State Council commissioned a feasibility study for the line.[13]
Policy planners debated the necessity and economic viability of high-speed rail service. Supporters argued that high-speed rail would boost future economic growth. Opponents noted that high-speed rail in other countries were expensive and mostly unprofitable[citation needed]. Overcrowding on existing rail lines, they said, could be solved by expanding capacity through higher speed and frequency of service. In 1995, Premier Li Peng announced that preparatory work on the Beijing Shanghai HSR would begin in the 9th Five Year Plan (1996–2000), but construction was not scheduled until the first decade of the 21st century.
The "Speed Up" campaigns
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
In 1993, commercial train service in China averaged only 48 km/h (30 mph) and was steadily losing market share to airline and highway travel on the country's expanding network of expressways.[14][15] The MOR focused modernization efforts on increasing the service speed and capacity on existing lines through double-tracking, electrification, improvements in grade (through tunnels and bridges), reductions in turn curvature, and installation of continuous welded rail. Through five rounds of "Speed-Up" campaigns in April 1997, October 1998, October 2000, November 2001, and April 2004, passenger service on 7,700 km (4,800 mi) of existing tracks was upgraded to reach sub-high speeds of Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value)..[16]
A notable example is the Guangzhou-Shenzhen Railway, which in December 1994 became the first line in China to offer sub-high-speed service of 160 km/h (99 mph) using domestically produced DF-class diesel locomotives. The line was electrified in 1998, and Swedish-made X 2000 trains increased service speed to Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).. After the completion of a third track in 2000 and a fourth in 2007, the line became the first in China to run high-speed passenger and freight service on separate tracks.
The completion of the sixth round of the "Speed-Up" Campaign in April 2007 brought HSR service to more existing lines: 423 km (263 mi) capable of Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). train service and 3,002 km (1,865 mi) capable of Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value)..[17][N 1] In all, travel speed increased on 22,000 km (14,000 mi), or one-fifth, of the national rail network, and the average speed of passenger trains improved to 70 km/h (43 mph). The introduction of more non-stop service between large cities also helped to reduce travel time. The non-stop express train from Beijing to Fuzhou shortened travel time from 33.5 to less than 20 hours.[20] In addition to track and scheduling improvements, the MOR also deployed faster CRH series trains. During the Sixth Railway Speed Up Campaign, 52 CRH trainsets (CRH1, CRH2 and CRH5) entered into operation. The new trains reduced travel time between Beijing and Shanghai by two hours to just under 10 hours.
Higher-speed express train service allowed more trains to share the tracks and improved rail transport capacity. But high-speed trains often have to share tracks with slower, heavy freight trains—in some cases with as little as 5 minutes headway.[20] To attain higher speeds and transport capacity, planners began to consider passenger-dedicated HSR lines on a grand scale.
The conventional rail v. maglev debate
The development of the HSR network in China was initially held up by a debate over the type of track technology to be used. In June 1998, at a State Council meeting with the Chinese Academies of Sciences and Engineering, Premier Zhu Rongji asked whether the high-speed railway between Beijing and Shanghai still being planned could use maglev technology.[21] At the time, planners were divided between using high-speed trains with wheels that run on conventional standard gauge tracks or magnetic levitation trains that run on special maglev tracks for a new national high-speed rail network.
Maglev received a big boost in 2000 when the Shanghai Municipal Government agreed to purchase a turnkey TransRapid train system from Germany for the 30.5 km (19.0 mi) rail link connecting Shanghai Pudong International Airport and the city. In 2004, the Shanghai Maglev Train became the world's first commercially operated high-speed maglev. It remains the fastest commercial train in the world with peak speeds of 431 km/h (268 mph) and makes the 30.5 km (19.0 mi) trip in less than 7.5 minutes.

Despite unmatched advantage in speed, the maglev has not gained widespread use in China's high-speed rail network due to high cost, German refusal to share technology and concerns about safety. The price tag of the Shanghai Maglev was believed to be $1.3 billion and was partially financed by the German government. The refusal of the Transrapid Consortium to share technology and source production in China made large-scale maglev production much more costly than high-speed train technology for conventional lines. Finally, residents living along the proposed maglev route have raised health concerns about noise and electromagnetic radiation emitted by the trains, despite an environmental assessment by the Shanghai Academy of Environmental Sciences saying the line was safe.[22] These concerns have prevented the construction of the proposed extension of the maglev to Hangzhou. Even the more modest plan to extend the maglev to Shanghai's other airport, Hongqiao, has stalled. Instead, a conventional subway line was built to connect the two airports, and a conventional high-speed rail line was built between Shanghai and Hangzhou.
While maglev was drawing attention to Shanghai, conventional track HSR technology was being tested on the newly completed Qinhuangdao-Shenyang Passenger Railway. This 405 km (252 mi) standard gauge, dual-track, electrified line was built between 1999 and 2003. In June 2002, a domestically made DJF2 train set a record of 292.8 km/h (181.9 mph) on the track. The China Star (DJJ2) train followed the same September with a new record of 321 km/h (199 mph). The line supports commercial train service at speeds of 200–250 km/h (120–160 mph), and has become a segment of the rail corridor between Beijing and Northeast China. The Qinhuangdao-Shenyang Line showed the greater compatibility of HSR on conventional track with the rest of China's standard gauge rail network.
In 2004, the State Council in its Mid-to-Long Term Railway Development Plan, adopted conventional track HSR technology over maglev for the Beijing–Shanghai High Speed Railway and three other north-south high-speed rail lines. This decision ended the debate and cleared the way for rapid construction of standard gauge, passenger dedicated HSR lines in China.[23][24]
Acquisition of foreign technology
Despite setting speed records on test tracks, the DJJ2, DJF2 and other domestically produced high-speed trains were insufficiently reliable for commercial operation.[25] The State Council turned to advanced technology abroad but made clear in directives that China's HSR expansion cannot only benefit foreign economies.[25] China's expansion must also be used to develop its own high-speed train building capacity through technology transfers. The State Council, MOR and state-owned train builders, the China North Car (CNR) and China South Car (CSR) used China's large market and competition among foreign train-makers to induce[vague] technology transfers.[clarification needed]
In 2003, the MOR was believed to favor Japan's Shinkansen technology, especially the 700 series.[25] The Japanese government touted the 40-year track record of the Shinkansen and offered favorable financing. A Japanese report envisioned a winner-take all scenario in which the winning technology provider would supply China's trains for over 8,000 km (5,000 mi) of high-speed rail.[26] However, Chinese citizens angry with Japan's World War II atrocities organized a web campaign to oppose the awarding of HSR contracts to Japanese companies. The protests gathered over a million signatures and politicized the issue.[27] The MOR delayed the decision, broadened the bidding and adopted a diversified approach to adopting foreign high-speed train technology.
In June 2004, the MOR solicited bids to make 200 high-speed train sets that can run 200 km/h (124 mph).[25] Alstom of France, Siemens of Germany, Bombardier Transportation based in Germany and a Japanese consortium led by Kawasaki all submitted bids. With the exception of Siemens which refused to lower its demand of RMB(¥) 350 million per train set and €390 million for the technology transfer, the other three were all awarded portions of the contract.[25] All had to adapt their HSR train-sets to China's own common standard and assemble units through local joint ventures (JV) or cooperate with Chinese manufacturers. Bombardier, through its joint venture with CSR's Sifang Locomotive and Rolling Stock Co (CSR Sifang), Bombardier Sifang (Qingdao) Transportation Ltd (BST). won an order for 40 eight-car train sets based on Bombardier's Regina design.[28] These trains, designated CRH1A, were delivered in 2006. Kawasaki won an order for 60 train sets based on its E2 Series Shinkansen for ¥9.3 billion.[29] Of the 60 train sets, three were directly delivered from Nagoya, Japan, six were kits assembled at CSR Sifang Locomotive & Rolling Stock, and the remaining 51 were made in China using transferred technology with domestic and imported parts.[30] They are known as CRH2A. Alstom also won an order for 60 train sets based on the New Pendolino developed by Alstom-Ferroviaria in Italy. The order had a similar delivery structure with three shipped directly from Savigliano along with six kits assembled by CNR's Changchun Railway Vehicles, and the rest locally made with transferred technology and some imported parts.[31] Trains with Alstom technology carry the CRH5 designation.
The following year, Siemens reshuffled its bidding team, lowered prices, joined the bidding for 350 km/h (217 mph) trains and won a 60-train set order.[25] It supplied the technology for the CRH3C, based on the ICE3 (class 403) design, to CNR's Tangshan Railway Vehicle Co. Ltd. The transferred technology includes assembly, body, bogie, traction current transforming, traction transformers, traction motors, traction control, brake systems, and train control networks.
Technology transfer
Achieving indigenous high-speed rail technology has been a major goal of Chinese state planners. Chinese train-makers, after receiving transferred foreign technology, have been able to achieve a considerable degree of self-sufficiency in making the next generation of high-speed trains by developing indigenous capability to produce key parts and improvising upon foreign designs.
Examples of technology transfer include Mitsubishi Electric’s MT205 traction motor and ATM9 transformer to CSR Zhuzhou Electric, Hitachi’s YJ92A traction motor and Alstom’s YJ87A Traction motor to CNR Yongji Electric, Siemens’ TSG series pantograph to Zhuzhou Gofront Electric. Most of the components of the CRH trains manufactured by Chinese companies were from local suppliers, with only a few parts imported.[citation needed]
For foreign train-makers, technology transfer is an important part of gaining market access in China. Bombardier, the first foreign train-maker to form a joint venture in China, has been sharing technology for the manufacture of railway passenger cars and rolling stock since 1998. Zhang Jianwei, President and Chief Country Representative of Bombardier China, stated that in a 2009 interview, “Whatever technology Bombardier has, whatever the China market needs, there is no need to ask. Bombardier transfers advanced and mature technology to China, which we do not treat as an experimental market.”[32] Unlike other series which have imported prototypes, all CRH1 trains have been assembled at Bombardier’s joint-venture with CSR, Bombardier Sifang in Qingdao.
Kawasaki’s cooperation with CSR did not last as long. Within two years of cooperation with Kawasaki to produce 60 CRH2A sets, CSR began in 2008 to build CRH2B, CRH2C and CRH2E models at its Sifang plant independently without assistance from Kawasaki.[33] According to CSR president Zhang Chenghong, CSR "made the bold move of forming a systemic development platform for high-speed locomotives and further upgrading its design and manufacturing technology. Later, we began to independently develop high-speed CRH trains with a maximum velocity of 300–350 kilometers per hour, which eventually rolled off the production line in December 2007."[34] Since then, CSR has ended its cooperation with Kawasaki.[35] Kawasaki challenged China's high-speed rail project for patent theft, but backed off the effort.[36]
Between June and September 2005, the MOR launched bidding for high-speed trains with a top speed of 350 km/h (217 mph), as most of the main high-speed rail lines were designed for top speeds of 350 km/h or higher. Along with CRH3C, produced by Siemens and CNR Tangshan, CSR Sifang bid 60 sets of CRH2C.
In 2007, travel time from Beijing to Shanghai was about 10 hours at a top speed of 200 km/h (124 mph) in the upgrade Beijing–Shanghai Railway. To increase transport capacity, the MOR ordered 70 16-car trainsets from CSR Sifang and BST, including 10 sets of CRH1B and 20 sets of CRH2B seating trains, 20 sets of CRH1E and 20 sets of CRH2E sleeper trains.
Construction of the high-speed railway between Beijing and Shanghai, the world's first high-speed rail with a designed speed of 380 km/h (236 mph), began on April 18, 2008. In the same year, the Ministry of Science and the MOR agreed to a joint action plan for the indigenous innovation of high-speed trains in China. The MOR then launched the CRH1-350 (Bombardier and BST, designated as CRH380D/DL), CRH2-350 (CSR, designated as CRH380A/AL), and CRH3-350 (CNR and Siemens, designated as CRH380B/BL & CRH380CL), to develop a new generation of CRH trains with a top operation speed of 380 km/h. A total of 400 new generation trains were ordered. The CRH380A, the first indigenous high-speed train of the CRH series, entered service on the Shanghai-Hangzhou High-Speed Railway on October 26, 2010.[37]
On October 19, 2010, the MOR announced the beginning of research and development of "super-speed" railway technology, which would increase the maximum speed of trains to over 500 km/h (311 mph).[38]
Early dedicated high-speed rail lines
After committing to conventional-track high-speed rail in 2006, the state embarked on an ambitious campaign to build passenger-dedicated high-speed rail lines, which accounted for a large part of the government's growing budget for rail construction. Total investment in new rail lines grew from $14 billion in 2004 to $22.7 and $26.2 billion in 2006 and 2007.[39] In response to the global economic recession, the government accelerated the pace of HSR expansion to stimulate economic growth. Total investments in new rail lines including HSR reached $49.4 billion in 2008 and $88 billion in 2009.[39] In all, the state planned to spend $300 billion to build a 25,000 km (16,000 mi) HSR network by 2020.[40][41]
As of 2007, the Qinhuangdao-Shenyang High-Speed Railway, which carried trains at top speed of 250 km/h (155 mph) along the Liaoxi Corridor in the Northeast, was the only passenger-dedicated HSR line (PDL) in China, but that would soon change as the country embarked on a high-speed railway construction boom. The MOR's “Mid-to-Long Term Railway Network Plan”, revised in 2008, called for the building of a national high-speed rail grid composed of 4 north-south corridors and 4 east-west corridors, which together with upgraded existing lines, would total 12,000 km (7,456 mi) in length. The earliest PDLs built were sections of the corridors that connected large cities in the same region. On April 19, 2008, Hefei–Nanjing PDL in the East opened with a top-speed of 250 km/h (155 mph). On August 1, 2008, the Beijing–Tianjin Intercity Railway opened in time for the 2008 Summer Olympics. This line between northern China’s two largest cities, was the first in the country to accommodate commercial trains with top speed of 350 km/h (217 mph) and featured the CRH2C and CRH3C train sets.
The Wuhan–Guangzhou High-Speed Railway (Wuguang PDL), which opened on December 26, 2009, was the country’s first cross-regional high-speed rail line. With a total length of 968 km (601 mi) and capacity to accommodate trains traveling at 350 km/h (217 mph), the Wuguang PDL set a world record for the fastest commercial train service with average trip speed of 312.5 km/h (194.2 mph). Train travel between central and southern China’s largest cities, Wuhan and Guangzhou, was reduced to just over three hours. On October 26, 2010, China opened its 15th high-speed rail, the Shanghai–Hangzhou line, and unveiled the CRH380A trainset manufactured by CSR Sifang started regular service. The Beijing–Shanghai High-Speed Railway, the second major cross-regional line, opened on June 2011 and was the first line designed with a top speed of 380 km/h (236 mph) in commercial service.[10][42]
By January 2011, China had the world’s longest high-speed rail network with about 8,358 km (5,193 mi)[43] of routes capable for at least 200 km/h (124 mph) running in service including 2,197 km (1,365 mi) of rail lines with top speeds of 350 km/h (217 mph).[44] The MOR reportedly committed investment of ¥709.1 billion (US$107.9 billion) in railway construction in 2010 and would invest ¥700 billion (US$106 billion) in 2011 on 70 railway projects, including 15 high-speed rail projects. Some 4,715 kilometres (2,930 mi) of new high-speed railways would be opened, and by the end of 2011, China would have 13,073 kilometres (8,123 mi) of railways capable of carrying trains at speeds of at least 200 km/h (124 mph).[45]
Corruption and concerns
In February 2011, Railway Minister Liu Zhijun, a key proponent of HSR expansion in China, was removed from office on charges of corruption. The Economist estimates Liu accepted ¥1 billion of bribes ($152 million) in connection with railway construction projects.[46] Investigators found evidence that another ¥187 million ($28.5 million) was misappropriated from the $33 billion Beijing–Shanghai High-Speed Railway in 2010.[47] Another top official in the Railways Ministry, Zhang Shuguang, was also sacked for corruption.[46] Zhang was estimated to have misappropriated to his personal overseas accounts the equivalent of $2.8 billion.[48]

After the political shake-up, concerns about HSR safety, high ticket prices, financial sustainability and environmental impact received greater scrutiny in the Chinese press.[9][49]
In April 2011, the new Minister of Railways Sheng Guangzu said that due to corruption, safety may have been compromised on some construction projects and completion dates may have to be pushed back.[46] Sheng announced that all trains in the high-speed rail network would operate at a maximum speed of Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). beginning on July 1, 2011.[9][50][51] This was in response to concerns over safety, low ridership due to high ticket prices,[52] and high energy usage.[49] On June 13, 2011, the MOR clarified in a press conference that the speed reduction was not due to safety concerns but to offer more affordable tickets for trains at 250 km/h (155 mph) and increase ridership. Higher-speed train travel uses greater energy and imposes more wear on expensive machinery. Railway officials lowered the top speed of trains on most lines that were running at 350 km/h (217 mph) to 300 km/h (186 mph). Trains on the Beijing-Tianjin high-speed line and a few other inter-city lines remained at 350 km/h.[53] In May 2011, China's Environmental Protection Ministry ordered the halting of construction and operation of two high-speed lines that failed to pass environmental impact tests.[54][55] In June, the MOR maintained that high-speed rail construction was not slowing down.[56] The CRH380A trainsets on the Beijing–Shanghai High-Speed Railway could reach a top operational speed of 380 km/h (240 mph) but were limited to 300 km/h.[10][11] Under political and public pressure, the National Audit Office (NAO) carried out an extensive investigation into the building quality of all high-speed rail lines. As of March 2011, no major quality defects had been found in the system.[57] Foreign manufacturers involved in Shanghai-Beijing high-speed link reported that their contracts call for maximum operational speed of 300 km/h (186 mph).[58] From July 20, 2011, the frequency of train service from Jinan to Beijing and Tianjin was reduced due to low occupancy, which renewed concerns about demand and profitability for high-speed services.[59] Service failures in the first month of operation drove passengers back to pre-existing slower rail service and air travel; airline ticket prices rebounded due to reduced competition.
Wenzhou accident
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
On July 23, 2011, two high-speed trains collided on the Ningbo–Taizhou–Wenzhou Railway in Lucheng District of Wenzhou, Zhejiang Province.[60][61][62] The accident occurred when one train traveling near Wenzhou was struck by lightning, lost power and stalled. Signals malfunctioned, causing another train to rear-end the stalled train.[61][63][64][65][66] Several carriages derailed.[67] State-run Chinese media confirmed 40 deaths, and at least 192 people hospitalised, including 12 who were severely injured.[68][69][70] The Wenzhou train accident and the lack of accountability by railway officials caused a public uproar and heightened concerns about the safety and management of China's high-speed rail system.[71][72] Quality and safety concerns also affected plans to export cheaper high-speed train technology to other countries.[73]
Following the deadly crash, the Chinese government suspended new railway project approvals and launched safety checks on existing equipment.[74][75] A commission was formed to investigate the accident with a directive to report its findings in September 2011.[76] On August 10, 2011, the Chinese government announced that it was suspending approvals of any new high-speed rail lines pending the outcome of the investigation.[77][78] The Minister of Railways announced further cuts in the speed of Chinese high-speed trains, with the speed of the second-tier 'D' trains reduced from 250 km/h (155 mph) to 200 km/h (124 mph).[79] The speed of the remaining 350 km/h (217 mph) trains between Shanghai and Hangzhou was reduced to 300 km/h (186 mph) as of August 28, 2011.[80] To stimulate ridership, on August 16, 2011 ticket prices on high-speed trains were reduced by five percent.[81] From July to September, high-speed rail ridership in China fell by nearly 30 million to 151 million trips.[82]
Slowdown in financing and construction
In the first half of 2011, the MOR as a whole made a profit of ¥4.29 billion and carried a total debt burden of ¥2.09 trillion, equal to about 5% of China’s GDP.[83][84] Earnings from the more profitable freight lines helped to off-set losses by high-speed rail lines.[citation needed] As of years ending 2008, 2009 and 2010, the MOR's debt-to-asset ratio was respectively, 46.81%, 53.06% and 57.44%,[85] and reached 58.58% by mid-year 2011.[86] As of October 12, 2011, the MOR had issued ¥160 billion of debt for the year.[84] But in the late summer, state banks began to cut back on lending to rail construction projects, which reduced funding for existing railway projects. An investigation of 23 railway construction companies in August 2011 revealed that 70% of existing projects had been slowed or halted mainly due to shortage of funding.[86] Affected lines included Xiamen-Shenzhen, Nanning-Guangzhou, Guiyang-Guangzhou, Shijazhuang-Wuhan, Tianjin-Baoding and Shanghai-Kunming high-speed rail lines.[82][83] By October, work had halted on the construction of 10,000 km (6,200 mi) of track.[82] New projects were put on hold and completion dates for existing projects, including the Tianjin-Baoding, Harbin-Jiamusi, Zhengzhou-Xuzhou and Hainan Ring (West), were pushed back.[86] As of October 2011, the MOR was reportedly concentrating remaining resources on fewer high-speed rail lines and shifting emphasis to more economically viable coal transporting heavy rail.[84]
To ease the credit shortage facing rail construction, the Ministry of Finance announced tax cuts to interest earned on rail construction financing bonds and the State Council ordered state banks to renew lending to rail projects.[82] In late October and November 2011, the MOR raised RMB 250 billion in fresh financing and construction resumed on several lines including the Tianjin-Baoding, Xiamen-Shenzhen and Shanghai-Kunming.[87]
Another project postponed or cancelled altogether was the proposed Chongqing-Xi'an High-Speed Railway, which was announced in September 2012. This line has been eliminated and travel between the two cities can be achieved by the Lanzhou–Chongqing and Xi'an-Chengdu lines, which will cross at Guangyuan in north-eastern Sichuan.[88]
Recovery
By early 2012, the Chinese government renewed investments in high-speed rail to rejuvenate the slowing economy.[91] Premier Wen Jiabao visited train manufacturers and gave a vote of confidence in the industry.[91] Over the course of the year, the MOR’s budget rose from $64.3 billion to $96.5 billion.[91] Five new lines totaling 2,563 km (1,593 mi) in length entered operation between June 30 and December 31, including the Beijing-Wuhan section of the Beijing-Guangzhou line.[4] By the end of 2012, the total length of high-speed rail tracks had reached 9,300 km (5,800 mi), and ridership had exceeded levels prior to the Wenzhou crash.[92][93] China's 1,580 high-speed trains were transporting 1.33 million passengers daily, about 25.7% of the overall passenger traffic.[4] The Beijing–Tianjin, Shanghai–Nanjing, Beijing–Shanghai and Shanghai-Hangzhou lines reported breaking even financially[6][94][95][96] The Shanghai-Nanjing line even reported to be operationally profitable,[95] operating with a 380 million yuan net profit.[94][95] However the system as a whole is still losing money and concerns about corruption, safety and high ticket prices persist.[96]
On December 28, 2013, the total length of high-speed rail tracks nationally topped 10,000 km (6,200 mi) with the opening of the Xiamen–Shenzhen, Xian–Baoji, Chongqing−Lichuan high-speed railways as well as intercity lines in Hubei and Guangxi.[97]
Second boom

In 2014, high-speed rail expansion gained speed with the opening of the Taiyuan–Xi'an, Hangzhou–Changsha, Lanzhou-Ürümqi, Guiyang-Guangzhou, Nanning-Guangzhou trunk lines and intercity lines around Wuhan, Chengdu,[98] Qingdao[99] and Zhengzhou.[100] High-speed passenger rail service expanded to 28 provinces and regions.[101] The number of high-speed train sets in operation grew from 1,277 pairs in June to 1,556.5 pairs in December.[101][102]
In response to a slowing economy, central planners approved a slew of new lines including Shangqiu-Hefei-Hangzhou,[103] Zhengzhou-Wanzhou,[104] Lianyungang-Zhenjiang,[105] Linyi-Qufu,[106] Harbin-Mudanjiang,[107] Yinchuan-Xi'an,[103] Datong-Zhangjiakou,[103] and intercity lines in Zhejiang[108] and Jiangxi.[103]
The government actively promoted the export of high-speed rail technology to countries including Mexico, Thailand, the United Kingdom, India, Russia and Turkey. To better compete with foreign trainmakers, the central authorities arranged for the merger of the country's two main high-speed train-makers, CSR and CNR, into the China Railway Rolling Stock Group.[109]
Current HSR expansion
China's high-speed rail expansion is entirely managed, planned and financed by the government.


Policy justifications
Critics both in China and abroad have questioned the necessity of having an expensive high-speed rail system in a largely developing country, where most workers cannot afford to pay a premium for faster travel.[40][41] The government has justified the expensive undertaking as promoting a number of policy objectives. HSR provides fast, reliable and comfortable means of transporting large numbers of travelers in a densely populated country over long distances,[110] which:
- Improves economic productivity and competitiveness over the long term by increasing the transport capacity of railways and linking labor markets.[41][111] Moving passengers to high-speed lines frees up older railways to carry more freight, which is more profitable for railways than passengers, whose fares are subsidized.[110]
- Stimulates the economy in the short term as HSR construction creates jobs and drives up demand for construction, steel and cement industries during the economic downturn. Work on the Beijing–Shanghai PDL mobilized 110,000 workers.[39][111][112]
- Facilitates cross-city economic integration and promotes the growth of second-tier cities. The introduction of the high-speed railways is responsible for 59% of the increase in market potential for the secondary cities connected by bullet trains. (Market potential, a concept used by economic geographers, measures "a geographic area's access to markets for inputs and outputs.") A 10% increase in a secondary city's market potential is expected to be associated with a 4.5% increase in its average real estate price.[113]
- Supports energy independence and environmental sustainability. Electric trains use less energy to transport people and goods on a per unit basis and can draw power from more diverse sources of energy including renewables than automobile and aircraft, which are more reliant on imported petroleum.[110]
- Develop an indigenous high-speed rail equipment industry. The expansion into HSR is also developing China into a leading source of high-speed rail building technology.[39] Chinese train-makers have absorbed imported technologies quickly, localized production processes, and even begun to compete with foreign suppliers in the export market. Six years after receiving Kawasaki's license to produce Shinkansen E2, CSC Sifang can produce the CRH2A without Japanese input, and Kawasaki has ended cooperation with Sifang on high-speed rail.[114]
HSR construction financing
China's high-speed rail construction projects are highly capital intensive. About 40-50% of financing is provided by the national government through lending by state owned banks and financial institutions, another 40% by the bonds issued by the Ministry of Railway (MOR) and the remaining 10-20% by provincial and local governments.[86][110] The MOR, through its financing arm, the China Rail Investment Corp, issued an estimated ¥1 trillion (US$150 billion in 2010 dollars) in debt to finance HSR construction from 2006 to 2010,[115] including ¥310 billion in the first 10 months of 2010.[116] CRIC has also raised some capital through equity offerings; in the spring of 2010, CRIC sold a 4.5 percent stake in the Beijing–Shanghai High-Speed Railway to the Bank of China for ¥6.6 billion and a 4.537 percent stake to the public for ¥6 billion.[115] CRIC retained 56.2 percent ownership on that line. As of 2010, the CRIC-bonds are considered to be relatively safe investments because they are backed by assets (the railways) and implicitly by the government.
Table:Construction cost of HSR lines in operation. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|

Large construction debt-loads require significant revenues from rider fares, subsidies, and/or other sources of income, such as advertising, to repay. Despite impressive ridership figures, virtually every completed line has incurred losses in its first years of operation. For example, the Beijing–Tianjin Intercity Railway in its two full years of operation, delivered over 41 million rides. The line cost ¥20.42 billion to build, and ¥1.8 billion per annum to operate, including ¥0.6 billion in interest payments on its ¥10 billion of loan obligations.[135] The terms of the loans range from 5–10 years at interest rates of 6.3 to 6.8 percent.[135] In its first year of operation from August 1, 2008 to July 31, 2009, the line carried 18.7 million riders and generated ¥1.1 billion in revenues, which resulted in a loss of ¥0.7 billion. In the second year, ridership rose to 22.3 million and revenues improved to ¥1.4 billion, which narrowed losses somewhat to below ¥0.5 billion.[135] To break even, the line must deliver 30 million rides annually.[135] To be able to repay principal, ridership would need to exceed 40 million.[135] In September 2010, daily ridership averaged 69,000 or an annual rate of 25.2 million.[135] In 2013, ridership totaled 25.85 million.[136] The line has a capacity of delivering 100 million rides annually[137] and initial estimated repayment period of 16 years.[135]
The Shijiazhuang-Taiyuan PDL lost ¥0.8 billion in its first year and is set to lose ¥0.9 billion in 2010.[115] The Southeast HSR corridor lost ¥0.377 billion in its first year beginning August 2009.[115] The Zhengzhou-Xian PDL since opening in February 2010 was expected to generate revenues of ¥0.6 billion in its first full year but must make interest payments of ¥1.1 billion. In the first three quarters of 2012, the line lost Y1.87 billion.[138] The losses must be covered by the operator, which is usually subsidized by local governments.[137] In December 2014, the Henan provincial government imposed a rule requiring municipal authorities pay 70% of the deficit incurred by Henan's intercity lines with the provincial authorities paying the remainder 30%.[139]
The MOR faces a debt-repayment peak in 2014.[115] Some economists recommend further subsidies to lower fares and boost ridership and ultimately revenues.[137] Others warn that the financing side of the existing construction and operation model is unsustainable.[137] If the rail-backed loans cannot be fully repaid, they may be refinanced or the banks may seize ownership of the railways.[115] To prevent that eventuality, the MOR is trying to improve management of its rapidly growing HSR holdings.[115]
Overall, ridership is growing as the high-speed rail network continues to expand. High-speed rail is also becoming relatively more affordable as fares have remained stable while worker wages have grown sharply over the same period.[140]
Cost comparisons
Currently, China's high-speed rail service costs significantly less than similar systems in developed countries, but is considerably more expensive than conventional rail service. For the 419 km (260 mi) trip from Beijing to Jinan, HSR costs CNY185 (US$30) and takes 1 hour 32 minutes, while a conventional train costs CNY73 (US$12) and takes about 6 hours.[141] By comparison, the Acela train from Washington DC to New York City (one of the most expensive trains in regular service) covering a slightly shorter distance of 230 mi (370 km) costs US$152–180 (Y930) and takes 2 hour 50 minutes.[142]
Impact on airlines
The spread of high-speed rail has forced domestic airlines in China to slash airfare and cancel regional flights.[143] The impact of high-speed rail on air travel is most acute for intercity trips under 500 km (310 mi).[143] By the spring of 2011, commercial airline service had been completely halted on previously popular routes such as Wuhan-Nanjing, Wuhan-Nanchang, Xi’an-Zhengzhou and Chengdu-Chongqing.[143] Flights on routes over 1,500 km (930 mi) are generally unaffected.[143] As of October 2013, high-speed rail was carrying twice as many passengers each month as the country’s airlines.[140]
Track network
China's high-speed rail system project is ambitious.[112][144] In 2008, the MOR planned to build 25,000 km (16,000 mi) of high-speed railways with trains reaching normal speeds of 350 km/h.[112][145] China invested $50 billion on its high-speed rail system in 2009 and the total construction cost of the high-speed rail system is $300 billion.[112] The main operator of regular high-speed train services is China Railway High-Speed (CRH).
China's conventional high-speed railway network is made up of four components:
- upgraded pre-existing rail lines that can accommodate high-speed trains,
- a national grid of mostly passenger dedicated HSR lines (PDLs),
- other newly built conventional rail lines, mostly in western China, that can carry high-speed passenger and freight trains, and
- certain regional "intercity" HSR lines.
Most of the rail lines now under construction belong to one of the three latter categories.[146]
Upgraded railways
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
Following the sixth round of the "railway speed up campaign" on April 18, 2007, some 6,003 km (3,730 mi) of track could carry trains at speeds of up to 200 km/h (124 mph). Of these, 848 km (527 mi) could attain 250 km/h (155 mph). These include the Qinhuangdao-Shenyang (Qinshen) Passenger Railway, and sections of the Qingdao-Jinan (Jiaoji), Shanghai-Kunming (Hukun) between Hangzhou and Zhuzhou, Guangzhou-Shenzhen (Guangshen), Beijing–Shanghai (Jinghu), Beijing-Harbin (Jingha), Beijing-Guangzhou (Jingguang), Longhai between Zhengzhou to Xuzhou, Railways. Upgrade work continues on other lines including the Wuhan-Danyang (Handan), Hunan-Guizhou (Xianggui), and Nanjing-Nantong (Ningqi) Railways.
Some 295 stations have been built or renovated to allow high-speed trains.[147]
National high-speed rail grid (4+4)
The centerpiece of the MOR's expansion into high-speed rail is a new national high-speed rail grid that is overlaid onto the existing railway network. According to the MOR's "Mid-to-Long Term Railway Network Plan" (revised in 2008), this grid is composed of eight high-speed rail corridors, four running north-south and four going east-west, and has a total of 12,000 km. Most of the new lines follow the routes of existing trunk lines and are designated for passenger travel only. They are known as passenger-designated lines (PDL). Several sections of the national grid, especially along the southeast coastal corridor, were built to link cities that had no previous rail connections. Those sections will carry a mix of passenger and freight. High-speed trains on PDLs can generally reach 300–350 km/h (190–220 mph). On mixed-use HSR lines, passenger train service can attain peak speeds of 200–250 km/h (120–160 mph). This ambitious national grid project was planned to be built by 2020, but the government's stimulus has expedited time-tables considerably for many of the lines.
Completed lines Partially completed lines. Click [show] for details.
Four North-South HSR corridors and constituent lines
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Beijing–Harbin (Jingha HSR) |
Main HSR corridor of Northeast China | 350 | 1700 | 2007-08-23 | 2019 |
Beijing–Shenyang (Jingshen High-Speed Railway) |
HSR from Beijing to Shenyang via Chengde, Fuxin and Chaoyang | 350 | 684 | 2014-02-28[148] | 2019[149] |
Harbin–Dalian (Hada HSR) |
HSR from Harbin to Dalian via Shenyang & Changchun | 350 | 904 | 2007-08-23 | 2012-12-01[150] |
Panjin–Yingkou (Panying HSR) |
Connects Yingkou on Harbin–Dalian HSR with Panjin on Qinhuangdao-Shenyang HSR | 350 | 89 | 2009-05-31 | 2013-09-12[151] |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Beijing–Shanghai (Jinghu HSR) |
Main north-south high-speed railway of East China | 350 | 1433 | 2008-01-08 | 2012-10-16 |
Beijing–Shanghai (Jinghu HSR) |
HSR from Beijing to Shanghai via Tianjin, Jinan, Xuzhou, Bengbu and Nanjing | 350 | 1302 | 2008-04-18 | 2011-06-30[152] |
Hefei–Bengbu (Hebeng HSR) |
Spur off Jinghu HSR from Bengbu to Hefei | 350 | 131 | 2008-01-08 | 2012-10-16[153] |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Beijing–Guangzhou–Shenzhen–Hong Kong (Jingguangshengang HSR) |
Main north-south high-speed rail corridor through North and South Central China | 200- 350 |
2229 | 2005-09-01 | 2017 |
Beijing–Shijiazhuang (Jingshi HSR) |
HSR from Beijing to Shijiazhuang | 350 | 281 | 2008-10-08 | 2012-12-26[154] |
Shijiazhuang–Wuhan (Shiwu HSR) |
HSR from Shijiazhuang to Zhengzhou | 350 | 838 | 2008-10-15 | 2012-12-26[154] |
HSR from Zhengzhou to Wuhan | 2012-09-28[155] | ||||
Wuhan–Guangzhou (Wuguang HSR) |
HSR from Wuhan to Guangzhou via Changsha | 350 | 968 | 2005-09-01 | 2009-12-26 2010-01-30[156] |
Guangzhou–Shenzhen (Guangshengang XRL) |
Mainland section of the Express Rail Link. HSR from Guangzhou to Shenzhen North Railway Station. | 350 | 116 | 2008-08-20 | 2011-12-26[157] |
Mainland section of the Express Rail Link. HSR from Shenzhen North to the border of Hong Kong. | 2015[158][159] | ||||
Shenzhen–Hong Kong (Guangshengang XRL) |
Hong Kong section of the Express Rail Link. HSR from the border of Shenzhen to Hong Kong. | 200 | 26 | 2010 | 2017[160] |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Hangzhou–Fuzhou–Shenzhen (Hangfushen HSR) |
Southeast Coastal Corridor from Shanghai to Shenzhen, with plans for a rail bridge across the Hangzhou Bay by 2020.[161] | 250- 350 |
1450 | 2005-08-01 | 2013-12-28 |
Hangzhou–Ningbo (Hangyong HSR) |
High-speed PDL from Hangzhou to Ningbo | 350 | 152 | 2009-04 | 2013-07-01[162] |
Ningbo–Taizhou–Wenzhou (Yongtaiwen HSR) |
Mixed passenger & freight HSR line along the coast of Zhejiang Province from Ningbo to Wenzhou via Taizhou. | 250 | 268 | 2005-10-27 | 2009-09-28 |
Wenzhou–Fuzhou (Wenfu HSR) |
Mixed passenger & freight HSR line from Wenzhou to Fuzhou. | 250 | 298 | 2005-01-08 | 2009-09-28 |
Fuzhou–Xiamen (Fuxia HSR) |
Mixed passenger & freight HSR line along the coast of Fujian Province from Fuzhou to Xiamen via Putian & Quanzhou. | 250 | 275 | 2005-10-01 | 2010-04-26 |
Xiamen–Shenzhen (Xiashen HSR) |
Mixed passenger & freight HSR line along the coast of Fujian and Guangdong from Xiamen to Shenzhen via Zhangzhou, Shantou & Huizhou. | 250 | 502 | 2007-11-23 | 2013-12-28[163] |
Four East-West HSR corridors and constituent lines
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Qingdao–Taiyuan (Qingtai HSR) |
HSR across North China consisting of three segments connecting Taiyuan, Shijiazhuang, Jinan and Qingdao. | 250 | 873 | 2005-06-01 | 2017 |
Jiao'ao (Qingdao)–Jinan (Jiaoji HSR) |
PDL connecting Qingdao and Jinan | 250 | 364 | 2007-01-28 | 2008-12-20 |
Jinan–Shijiazhuang (Shijiazhuang–Jinan High-Speed Railway) |
PDL connecting Shijiazhuang & Jinan via Dezhou | 250 | 319 | 2014-03-16[164] | 2017 |
Shijiazhuang–Taiyuan (Shijiazhuang–Taiyuan High-Speed Railway) |
PDL connecting Shijiazhuang & Taiyuan. | 250 | 190 | 2005-06-11 | 2009-04-01 |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Xuzhou–Lanzhou (Xulan High-Speed Railway) |
HSR across the Yellow River Valley of central China, consisting of four segments connecting Xuzhou, Zhengzhou, Xian, Baoji and Lanzhou. | 250- 350 |
1363 | 2005-06-01 | 2017 |
Xuzhou–Zhengzhou (Zhengzhou–Xuzhou High-Speed Railway) |
PDL connecting Xuzhou & Zhengzhou | 350 | 357 | 2012-12-26[165] | 2016-12 |
Zhengzhou–Xi'an (Zhengzhou–Xi'an High-Speed Railway) |
PDL connecting Zhengzhou & Xian | 350 | 455 | 2005-09-01 | 2010-02-06 |
Xi'an–Baoji (Xi'an–Baoji High-Speed Railway) |
PDL connecting Xi'an & Baoji | 350 | 148 | 2009-11-22 | 2013-12-28[166] |
Baoji–Lanzhou (Baoji–Lanzhou High-Speed Railway) |
PDL connecting Baoji & Lanzhou | 250 | 403 | 2012-10[167][168][169] | 2017 |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Shanghai–Wuhan–Chengdu (Huhanrong HSR) |
HSR corridor through the Yangtze Valley, consisting of the Shanghai-Nanjing section of the Beijing–Shanghai PDL, and 7 mixed-use HSR segments connecting Nanjing, Hefei, Wuhan, Yichang, Lichuan, Chongqing, Suining & Chengdu. | 200- 350 |
2078 | 2003-12-01 | 2013-12-28 |
Shanghai–Nanjing |
shares track with Shanghai-Nanjing section of Beijing-Shanghai HSR | 350 | 301 | 2008-07-01 | 2010-07-01 |
Nanjing–Hefei (Hening HSR) |
Mixed passenger & freight HSR connecting Nanjing & Hefei | 250 | 166 | 2005-06-11 | 2008-04-19 |
Hefei–Wuhan (Hewu HSR) |
Mixed passenger & freight HSR connecting Hefei & Wuhan | 250 | 351 | 2005-08-01 | 2009-04-01 |
Hankou (Wuhan)–Yichang (Hanyi R.R.) |
Mixed passenger & freight HSR connecting Wuhan & Yichang | 250 | 293 | 2008-09-17 | 2012-07-01 |
Yichang–Wanzhou (Yichang–Lichuan section of Yiwan R.R.) |
Mixed passenger & freight HSR connecting Yichang & Lichuan[170] | 200 | 377 | 2003-12-01 | 2010-12-23 |
Lichuan–Chongqing (Yuli R.R.) |
Mixed passenger & freight HSR connecting Lichuan & Chongqing | 200 | 264 | 2008-12-29 | 2013-12-28[166] |
Chongqing–Suining (Suiyu R.R.) |
Mixed passenger & freight HSR connecting Chongqing & Suining | 200 | 132 | 2009-01-18 | 2012-12-31 |
Dazhou–Chengdu (Suining–Chengdu section of Dacheng R.R.) |
Mixed passenger & freight HSR connecting Suining & Chengdu. | 200 | 148 | 2005-05 | 2009-06-30 |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Shanghai–Kunming (Hukun HSR) |
PDL connecting East, Central and Southwest China. It consists of three sections connecting Shanghai, Hangzhou, Changsha and Kunming. | 350 | 2066 | 2008-12-28 | 2016 |
Shanghai–Hangzhou (Shanghai–Hangzhou High-Speed Railway) |
PDL connecting Shanghai Hongqiao & Hangzhou East. | 350 | 150 | 2009-02-26 | 2010-10-26 |
Hangzhou–Changsha (Hangzhou–Changsha High-Speed Railway) |
PDL from Hangzhou to Nanchang | 350 | 582 | 2010-07-01 | 2014-12-10[171][172] |
PDL from Nanchang to Changsha | 344 | 2009-02-26 | 2014-09-16[173] | ||
Changsha–Kunming (Changsha–Kunming High-Speed Railway) |
PDL from Changsha to Guiyang | 350 | 702 | 2010-03-26 | 2015-6-18[174] |
PDL from Guiyang to Kunming | 473 | 2016[175] |
Other high-speed rail lines
According to the "Mid-to-Long Term Railway Network Plan" (revised in 2008), the MOR plans to build over 40,000 km (25,000 mi) of railway in order to expand the railway network in western China and to fill gaps in the networks of eastern and central China. Some of these new railways are being built to accommodate speeds of 200–250 km/h (120–160 mph) for both passengers and freight. These are also considered high-speed rail though they are not part of the national PDL grid or Intercity High Speed Rail.
Completed lines Partially completed lines. Click [show] for details.
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Lanzhou–Ürümqi (Lanzhou-Xinjiang High-Speed Railway) |
HSR from Lanzhou to Ürümqi via Xining, Zhangye, Jiuquan, Jiayuguan, Hami & Turpan | 250 | 1776 | 2010 | 2014 |
Lanzhou–Hami Section |
HSR from Lanzhou to Hami via Xining, Zhangye, Jiuquan & Jiayuguan | 250 | 1236 | 2010 | 2014-12-26[176] |
Hami–Ürümqi Section |
HSR from Hami to Ürümqi via & Turpan | 250 | 540 | 2010 | 2014-11-16 |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Tianjin–Shenyang HSR | HSR link between the Jingha and Jinghu PDL from Tianjin to Shenyang through Qinhuangdao. | 250-350 | 665 | 1999 | 2013-12-01 |
Tianjin–Qinhuangdao (Tianjin–Qinhuangdao High-Speed Railway) |
PDL connecting Tianjin & Qinhuangdao. | 350 | 261 | 2008 | 2013-12-01[177] |
Qinhuangdao–Shenyang (Qinhuangdao–Shenyang High-Speed Railway) |
PDL connecting Qinhuangdao & Shenyang. | 250 | 404 | 1999 | 2003-07-01 |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Guangxi Coastal (Guangxi Coastal Railway Expansion and Reconstruction Project) |
HSR from Nanning to the Guangxi coast via Qinzhou. | 250 | 261 | 2008-12-11 | 2013-12-28 |
Nanning–Qinzhou (Nanning–Qinzhou High-Speed Railway) |
HSR from Nanning to Qinzhou. | 250[178] | 99 | 2008-12-11[179] | 2013-12-28[180] |
Qinzhou–Fangchenggang (Qinzhou–Fangchenggang High-Speed Railway) |
HSR from Qinzhou to Fangchenggang. | 250 | 63 | 2009-06-23 | 2013-12-28[180] |
Qinzhou–Beihai (Qinzhou–Beihai High-Speed Railway) |
HSR from Qinzhou to Beihai. | 250 | 100 | 2009-06-23 | 2013-12-28[180] |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Datong–Xi'an (Datong–Xi'an High-Speed Railway) |
HSR from Datong to Xi'an via Taiyuan. | 200–250 | 859 | 2009-12-03 | 2014-07-01[181] 2015 |
Datong–Taiyuan |
HSR from Datong to Taiyuan. | 200-250 | 2009-12-03 | 2015 | |
Taiyuan–Xi'an |
HSR from Taiyuan to Xi'an | 250 | 2009-12-03 | 2014-07-01[182] |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Chengdu–Guangzhou (Chengguang High-Speed Railway) | HSR from the Pearl River Delta to the Sichuan Basin via Guiyang & Guilin. | 300–350 | 1376 | 2008-10-13 | 2019 |
Chengdu–Guiyang (Chengdu–Guiyang High-Speed Railway) |
PDL connecting Chengdu & Guiyang via Leshan, Yibin & Bijie. | 350 | 519 | 2013-12-25[183] | 2019[183] |
Guiyang–Guangzhou (Guiyang–Guangzhou High-Speed Railway) |
PDL connecting Guiyang & Guangzhou. | 250 | 856 | 2008-10-13 | 2014-12-26[184] |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Nanchang-Shenzhen (Nanchang-Shenzhen High-Speed Railway) |
HSR from the Pearl River Delta to the Jiangxi via Ganzhou | 250–350 | 880 | 2014-12-20 | 2020 |
Nanchang–Ganzhou (Nanchang–Ganzhou High-Speed Railway) |
PDL connecting Nanchang & Ganzhou. | 250 | 422 | 2014-12-20[185] | 2020 |
Ganzhou–Shenzhen (Ganzhou–Shenzhen High-Speed Railway) |
PDL connecting Ganzhou & Shenzhen. | 250 | 458 | 2015[186] | 2020 |
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Maoming–Zhanjiang (Maoming–Zhanjiang High-speed railway) |
HSR from Maoming to Zhanjiang | 250 | 103 | 2009-03-21[187] | 2013-12-28[188] |
Shenzhen-Maoming (Shenzhen-Maoming High-speed railway) |
HSR from Shenzhen to Maoming via Nansha, Zhongshan, Jiangmen & Yangjiang | 250 | 372 | 2013[189] | 2016 |
Tianjin–Baoding (Tianjin–Baoding Intercity Railway) |
HSR from Tianjin to Baoding via Bazhou & Baiyangdian. | 250 | 158 | 2011-03-18 | 2015[190] |
Beijing-Zhangjiakou | HSR from Beijing to Zhangjiakou. | 200 | 173 | 2014 | 2017 |
Zhangjiakou–Hohhot | HSR from Zhangjiakou to Hohhot via Ulanqab. | 250 | 286 | 2014-3-28 | 2018 |
Datong–Zhangjiakou | HSR from Datong to Zhangjiakou | 250 | 137 | 201x | - |
Hefei–Fuzhou (Hefei–Fuzhou High-Speed Railway) |
HSR from the Hefei to Fuzhou via Huangshan, Shangrao & Wuyishan. | 300 | 806 | 2010-04-27 | 2015-06-28 |
Xi'an–Chengdu | HSR from Xi'an to Chengdu via Hanzhong and Guangyuan. | 250 | 510 | 2010-11-10 | 2017 |
Chongqing–Guiyang | HSR from Chongqing to Guiyang. | 200 | 345 | 2010-12-22 | 2017[191] |
Kunming–Nanning (formerly Yunnan–Guangxi High-speed railway) |
HSR from Nanning to Kunming via Baise. | 200–250 | 710 | 2010-12-27 | 2015-12-11[192] Nanning-Baise |
2016[193] Baise-Kunming |
|||||
Jilin–Hunchun | HSR linking Jilin and Hunchun | 250 | 359 | 2010[194] | 2015 |
Shangqiu–Hefei–Hangzhou | HSR linking Shangqiu, Hefei and Hangzhou | 350 | 770 | 2014[195] | 2020[196] |
Zhengzhou–Wanzhou | HSR linking Zhengzhou, Xiangyang, Badong and Wanzhou | - | 770 | 2015[197] | 2020 |
Meizhou–Chaozhou-Shantou | HSR linking Meizhou, Chaozhou and Shantou | 250 | 120 | 2014[198] | 2017 |
Lianyungang–Huai’an–Yangzhou–Zhenjiang | HSR linking Lianyungang, Huai'an, Yangzhou and Zhenjiang | 250 | 305 | 2014-12-26[199] | 2019 |
- Class I high-speed railways
Line | Design Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date | Ref |
---|---|---|---|---|---|
Longyan-Xiamen Railway | 200 | 171 | 2006-12-25 | 2012-06-29 | [200] |
Xiangtang-Putian Railway | 200 | 635 | 2007-11-23 | 2013-09-26 | [201] |
Hengyang–Liuzhou Railway | 200 | 498 | 2008-12-11 | 2013-12-28 | [202] |
Guangzhou-Nanning Railway | 250 | 577 | 2008-09-11 | 2014-04-18 2014-12-26 |
[203] [184] |
Ganzhou–Longyan Railway (capacity expansion project) |
200 | 274 | 2009-12-29 | 2015-12-25 | [204] |
Chongqing–Lanzhou Railway | 200 | 832 | 2009 | 2016 | [205] |
Nanping-Sanming-Longyan Railway | 250 | 247 | 2010-12-25 | 2017 | [206] |
Chengdu–Lanzhou Railway | 200 | 730 | 2011-02-26 | 2017 | [207] |
Jiujiang–Quzhou Railway | 200 | 333 | 2013-12-29 | 2017 | [208][209] |
Shanghai–Nantong Railway | 200 | 137 | 2014-03-01 | 2018 | [210] |
Fuzhou–Pingtan Railway | 160-200 | 88.4 | 2013-10-31 | 2019 | [211] |
Qianjiang–Zhangjiajie–Changde Railway | 200 | 340 | 2014-12-29 | 2019 | [212] |
Qingdao-Lianyungang Railway | 200 | 194.5 | 2014-12-29 | 2018 | [213] |
High-speed intercity railways
Intercity railways are designed to provide regional high-speed rail service between large cities and metropolitan areas that are generally within the same province. They are built with the approval of the central government but are financed and operated largely by local governments with limited investment and oversight from the China Rail Corporation. Some intercity lines run parallel to other high-speed rail lines but serve more stations along the route. Intercity HSR service speeds range from 200–350 km/h (120–220 mph).
Operational lines are marked with green background.
Service
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
China Railways, the MOR's national rail service operator, provides high-speed train service called China Railway High-speed (CRH) (中国铁路高速) on upgraded conventional rail lines, national high-speed railways and intercity high-speed lines. The CRH's high-speed trains are also called "Harmony Express." In October 2010, CRH service more than 1,000 trains per day, with a daily ridership of about 925,000.[255] as of May, 2015, a total of 1469 CRH trainsets were put into use.
Ridership
Ridership | ||
---|---|---|
Year | million riders | ±% p.a. |
2007 | 61.21 | — |
2008 | 127.73 | +108.68% |
2009 | 179.58 | +40.59% |
2010 | 290.54 | +61.79% |
2011 | 440 | +51.44% |
2012 | 486 | +10.45% |
2013 | 672 | +38.27% |
2014 | 893.2 | +32.92% |
Source: [4] 2011[256][257] |
Annual HSR ridership is highest in the world. China is the third country, after Japan and France, to have one billion cumulative HSR passengers.
CRH service on upgraded conventional lines


As of September 2010, there were 2,876 kilometres (1,787 mi) of upgraded conventional railways in China that can accommodate trains running speeds of 200 to 250 km/h.[258] Over time with the completion of the national high-speed passenger-dedicated rail network, more CRH service will shift from these lines to the high-speed dedicated lines.
A. Intercity service (typically, listed in schedules as C-series or D-series trains):
- Beijing – Beidaihe, Qinhuangdao
- Beijing – Tianjin, Tanggu
- Beijing – Shijiazhuang, Taiyuan
- Shanghai – Kunshan, Suzhou, Wuxi, Changzhou, Nanjing, Hefei, Xuzhou
- Shanghai – Hangzhou, Yiwu, Jinhua, Quzhou
- Nanjing – Hangzhou
- Guangzhou – Shenzhen
- Wuhan – Zhengzhou, Changsha
- Changsha – Nanchang
- Xi'an – Baoji
B. Long-haul service (typically, listed in schedules as G-series or D-series trains):
- Beijing – Shenyang, Changchun, Harbin
- Beijing – Jinan, Qingdao, Shanghai
- Beijing – Zhengzhou, Wuhan
- Shanghai – Zhengzhou, Qingdao, Shenyang
- Shanghai – Nanchang
- Wuhan – Changsha – Guangzhou
Table:HSR service on conventional rail lines | ||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
The table belows lists the upgraded conventional railways that run 10 or more CRH high-speed trains per day.
|
CRH service on high-speed lines
Table:CRH service on high-speed rail lines | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
The following table lists the frequency of CRH service on 14 HSR lines (as of February, 2011). In some cases, CRH trains must still share the HSR lines with slower, non-high-speed trains, which are not listed in the table. Note China's first HSR, the Qinshen PDL service as part of the Jingha Railway.
|
Overnight high-speed trains
Lua error in package.lua at line 80: module 'strict' not found. Unlike the "conventional" (non-CRH trains), which run round the clock, most high-speed rail lines operations shut down each night. (See e.g. schedules for Shanghai Hongqiao Railway Station; as of mid-December 2012, the first train of the day to leave the station is the 06:33 train to Wuhan, and the last one is the 21:10 train to Nanjing, which arrives there before 23:00.[303]). While there are several sleeper EMU trainsets (abbreviated 动卧, dongwo) in existence running on the upgraded rail, the overnight service is mostly limited to a few night trains between Shanghai and Beijing. With the schedule change planned for 2012-12-21, some of these trainsets will be re-purposed to also provide overnight high-speed service between Shanghai and Xi'an North.[304]
Elsewhere, the fastest overnight rail service available is provided by fairly fast, but "conventional" (not CRH) Z-series trains. Some of them also use certain sections of the high-speed rail network; e.g., the planned Shanghai-Chengdu train Z121/2/3/4 will use the Huhanrong Line from Nanjing to Wuhan.[304]
In the 2014 Chunyun season, overnight HSR trains first ran on Beijing-Guangzhou (Jingguang) and other lines.
Technology
Rolling stock

China Railway High-speed runs different electric multiple unit (trainsets), the designs of which all are imported from other nations and given the designations CRH-1 through CRH-5. CRH trainsets are intended to provide fast and convenient travel between cities. Some of the trainsets are manufactured locally through technology transfer, a key requirement for China. The signalling, track and support structures, control software and station design are developed domestically with foreign elements as well, so the system as a whole could be called Chinese. China currently holds many new patents related to the internal components of these train sets since they have re-designed major components so the trains can run at a much higher speed than the original foreign train design.
- CRH1, produced by Bombardier's joint venture Sifang Power (Qingdao) Transportation (BST); CRH1A & CRH1B, nicknamed "Metro" or "Bread", derived from Bombardier Regina; CRH1E, nicknamed "Lizard", is Bombardier's ZEFIRO 250 design.
- CRH2, nicknamed "Hairtail", derived from E2 Series 1000 Shinkansen.
- CRH2A: In 2006, China unveiled (CRH2), a modified version of the Japanese Shinkansen E2-1000 series. An order for 60 8-car sets had been placed in 2004, with the first few built in Japan, the rest produced by Sifang Locomotive and Rolling Stock in China.[305]
- CRH2B: a modified 16-car version of CRH2; maximum operating speed of 250 km/h.
- CRH2C (Stage one): a modified version of CRH2, with a maximum operating speed up to 300 km/h achieved by replacing two intermediate trailer cars with motored cars.
- CRH2C (Stage two): a modified version of CRH2C (Stage one version), with a maximum operating speed up to 350 km/h by replacing motors with more powerful ones.
- CRH2E: a modified 16-car version of CRH2 with sleeping cars.
- CRH3C: nicknamed "Rabbit"; derived from Siemens ICE3 (class 403); 8-car sets; maximum operating speed of 350 km/h.
- CRH5A: nicknamed "Donkey"; derived from Alstom Pendolino ETR600; 8-car sets; maximum operating speed of 250 km/h[306]
- CRH6: Designed by CSR Puzhen and CSR Sifang, to be manufactured by CSR Jiangmen, it is designed to have two versions, one with a top operating speed of 220 km/h, and the other with a top operating speed of 160 km/h, to be used at 200 km/h or 250 km/h Inter-city High Speed Rail lines, planned to enter service in late 2012.[clarification needed]
- CRH380A: Maximum operating speed of 380 km/h; Developed by CSR and manufactured by CSR SIfang; entered service in 2010.
- CRH380B: upgraded version of CRH3; maximum operating speed of 380 km/h, manufactured by Tangshan Railway Vehicle & Changchun Railway Vehicles; entered service in 2011.
- CRH380CL: designed and manufactured by Changchun Railway Vehicles; maximum operating speed of 380 km/h; scheduled to enter service in 2012.
- CRH380D: also named Zefiro 380; maximum operating speed of 380 km/h; manufactured by Bombardier Sifang (Qingdao) Transportation Ltd. (BST); planned to enter service in 2012.
CRH1A, B,E, CRH2A, B,E, and CRH5A are designed for a maximum operating speed (MOR) of 200 km/h and can reach up to 250 km/h. CRH3C and CRH2C designs have an MOR of 300 km/h, and can reach up to 350 km/h, with a top testing speed more than 380 km/h. However, issues such as cost of maintenance, comfort, and safety make the maximum design speed of more than 380 km/h impractical and remain limiting factors.
Equipment type | Top speed in test | Designed speed | Seating capacity | Formation | Power (under 25 kV) |
Enter Service |
---|---|---|---|---|---|---|
CRH1A | 278 km/h (173 mph) | 250 | 668 or 611 or 645 | 5M3T | 5,300 kW | 2007 |
CRH1B | 292 km/h (181 mph) | 250 | 1299 | 10M6T | 11,000 kW | 2009 |
CRH1E | 250 | 618 or 642 | 10M6T | 11,000 kW | 2009 | |
CRH2A | 282 km/h (175 mph) | 250 | 610 or 588 | 4M4T | 4,800 kW | 2007 |
CRH2B | 275 km/h (171 mph) | 250 | 1230 | 8M8T | 9,600 kW | 2008 |
CRH2C Stage 1 | 394.2 km/h (244.9 mph) | 300 | 610 | 6M2T | 7,200 kW | 2008 |
CRH2C Stage 2 | 350 | 610 | 6M2T | 8,760 kW | 2010 | |
CRH2E | 250 | 630 | 8M8T | 9,600 kW | 2008 | |
CRH3C | 394.3 km/h (245.0 mph) | 350 | 600 or 556 | 4M4T | 8,800 kW | 2008 |
CRH5A | 250 | 622 or 586 or 570 | 5M3T | 5,500 kW | 2007 | |
CRH380A | 416.6 km/h (258.9 mph) | 380 | 494 | 6M2T | 9,600 kW | 2010 |
CRH380AL | 486.1 km/h (302.0 mph) | 380 | 1027 | 14M2T | 20,440 kW | 2010 |
CRH380B | 380 | unknown | 4M4T | 9,200 kW | 2011 (plan) | |
CRH380BL | 487.3 km/h (302.8 mph) | 380 | 1004 | 8M8T | 18,400 kW | 2010 |
CRH380CL | 380 | 8M8T | 19,200 kW | 2012 (plan) | ||
CRH380D | 380 | 495 | 4M4T | 10,000 kW | 2012 (plan) | |
CRH380DL | 380 | 1013 | 8M8T | 20,000 kW | Canceled (2012 original plan) | |
CRH6 | 220 | 586 | 4M4T | unknown | 2011 (plan) |
Table:CRH trainset orders | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Table:CRH trainset deliveries | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Based on data published by Sinolink Securities,[325][326] some small changes were made according to the most recent news.
|
Track technology

Many of the Passenger Designated Lines use ballastless tracks, which allow for smoother train rides at high speeds and can withstand heavy use without warping. The ballastless track technology, imported from Germany, carries higher upfront costs but can reduce maintenance costs.[327][328]
Typical application of track technology in China high-speed lines
Type | Classify | Technology | line |
CRTSIs | slab track | RTRI, Japan | Hada PDL |
CRTSIIs | slab track | Max Bögl, Germany | Jingjin ICL |
CRTSIIIs | slab track | CRCC,China | Chengguan PDL |
CRTSIb | ballastless track | Rail.one, Germany | Wuguang PDL |
CRTSIIb | ballastless track | Züblin, Germany | Zhengxi PDL |
Technology export
Chinese train-makers and rail builders have signed agreements to build HSRs in Turkey, Venezuela and Argentina[329] and are bidding on HSR projects in the United States, Russia, Saudi Arabia, Brazil (São Paulo to Rio de Janeiro) and Myanmar, and other countries.[40] They are competing directly with the established European and Japanese manufacturers, and sometimes partnering with them. In Saudi Arabia's Haramain High Speed Rail Project, Alstom partnered with China Railway Construction Corp. to win the contract to build phase I of the Mecca to Medina HSR line, and Siemens has joined CSR to bid on phase II.[330] China is also competing with Japan, Germany, South Korea, Spain, France and Italy to bid for California's high-speed rail line project, which would connect San Francisco and Los Angeles.[331] In November 2009, the MOR signed preliminary agreements with the state's high-speed rail authority and General Electric (GE) under which China would license technology, provide financing and furnish up to 20 percent of the parts with the remaining sourced from American suppliers, and final assembly of the rolling stock in the United States.[332]
In January 2014, the China Railway Construction Corporation completed a 30-km section of the Ankara-Istanbul high-speed railway between Eskişehir and İnönü in western Turkey.[333]
In mid 2015, China has signed up to design a high-speed railway between the Russian cities of Moscow and Kazan, one of the first concrete examples of the new business with China that Russian officials have been pursuing with renewed vigor since falling out with the West.A unit of Russia’s state-owned JSC Russian Railways signed a contract Thursday with the design unit of China’s state-controlled China Railway Group to come up with the plans for a 770 kilometer high-speed rail between the two Russian cities. The Chinese firm will work alongside two Russian companies for on the designs for a total cost of 20.8 billion rubles ($383 million) over the next two years, according to Russian Railways.
Once the designs are developed, a separate tender will be held for the actual construction of the rail link, which Russian Railways expects to cost 1.06 trillion rubles ($19.5 billion).[334]
Maglev high-speed rail
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
China has the world's only maglev high-speed train line in operation: The Shanghai Maglev Train, a turnkey Transrapid maglev demonstration line 30.5 km long. The trains have a top operational speed of 430 km/h and can reach a top non-commercial speed of 501 km/h. It has shuttled passengers between Shanghai's Longyang Road Metro Station and Shanghai Pudong International Airport since March, 2004. Service was briefly interrupted by an electrical fire in 2006. Shanghai authorities have been trying without success to extend the 30.5 km maglev line. An intercity link with Hangzhou was approved by the central government in 2006, but construction has been postponed.[335] Work on a shorter extension to Shanghai Hongqiao International Airport is also stalled.
Records
Fastest trains in China

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
The "fastest" train commercial service can be defined alternatively by a train's top speed or average trip speed.
- The fastest train service measured by peak operational speed is the Shanghai Maglev Train which can reach 431 km/h (268 mph). Due to the limited length of the Shanghai Maglev track (30 km)(18.6 mi), the maglev train's average trip speed is only 245.5 km/h (152.5 mph).
- The fastest train service measured by average trip speed from 2009 until 2011 was on the Wuhan-Guangzhou High-Speed Railway, where from December 2009 until July 1, 2011, the CRH3/CRH2 coupled-train sets averaged 312.5 km/h (194.2 mph) on the 922 km (573 mi) route from Wuhan to Guangzhou North. However, on July 1, 2011 in order to save energy and reduce operating costs, the maximum speed of Chinese high-speed trains was reduced to 300 km/h, and the average speed of the fastest trains on the Wuhan-Guangzhou High-Speed Railway was reduced to 272.68 km/h (169 mph).
- The top speed attained by a non-maglev train in China is 487.3 km/h (302.8 mph) by a CRH380BL train on the Beijing–Shanghai High-Speed Railway during a testing run on January 10, 2011.[336]
Longest service distance
The G/1276/7-G1278/5 Harbin-Wuhan train (2446 km, 14 1/2 hours), which began service on December 10, 2014, became the longest high-speed rail service in the world.[337] It overtook the G1202 Harbin-Shanghai train (2421 km, 12 hours), which had set the previous record on December 28, 2012.[337]
See also
Notes
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
![]() |
Wikimedia Commons has media related to China Railway High-speed. |
![]() |
Wikivoyage has a travel guide for [[Wikivoyage:High-speed rail in China#Lua error in Module:Wikidata at line 863: attempt to index field 'wikibase' (a nil value).|High-speed rail in China]]. |
- The International Maglev Board: Maglev in China
- www.tielu.org – Timetables and train connections (Chinese)
- Individual Map for each train in Google maps with timetable in Chinese or English
- Longest high speed rail networks in china
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 4.0 4.1 4.2 4.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "High-speed rail a vital social good" Global Times 2014-12-15
- ↑ 9.0 9.1 9.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 10.0 10.1 10.2 "China's fastest high speed train 380A rolls off production line" Xinhua 2010-05-27
- ↑ 11.0 11.1 "时速380公里高速列车明年7月开行" 2010-11-02
- ↑ 12.0 12.1 Louise Young. Japan's Total Empire. Berkeley: University of California Press 1998. pp.246-7.
- ↑ 13.0 13.1 13.2 (Chinese) "京沪高速铁路的论证历程大事记" Accessed 2010-10-04
- ↑ (Chinese) 高铁时代 中国国家地理网 2010-04-07
- ↑ By the mid-1990s, average train speed in China was about 60 km/h (37 mph). (Chinese) "China plans five-year leap forward of railway development " Accessed 2006-09-30
- ↑ (Chinese) "中国铁道部六次大提速" Sina News Center Accessed 2010-10-04
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 20.0 20.1 International Railway Journal – Rail And Rapid Transit Industry News Worldwide[dead link]
- ↑ (Chinese)[1] Accessed 2010-10-13
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 25.0 25.1 25.2 25.3 25.4 25.5 (Chinese) "中国式高铁的诞生与成长" Xinhua March 4, 2010
- ↑ (Chinese) "日本等待中国'求婚'" 2003-08-06
- ↑ "Violence flares as the Chinese rage at Japan" Guardian 2005-04-17
- ↑ "High speed Train CRH1 – China" Bombardier Accessed 2010-08-14
- ↑ "Kawasaki Wins High-Speed Train Order for China"[dead link] 2004–10
- ↑ "How Japan Profits From China's Plans" Forbes 2009-10-26
- ↑ (Chinese) "CRH5型动车组详细资料" 中国铁路网 2009-11-18
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 39.0 39.1 39.2 39.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 40.0 40.1 40.2 "China to Bid on US High-Speed Rail Projects" A.P.[dead link] March 13, 2010
- ↑ 41.0 41.1 41.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "时速380公里高速列车明年7月开行 " 2010-11-02
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.uic-highspeed2010.com.cn/upload/ChineseRailways20101011.pdf
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 46.0 46.1 46.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 49.0 49.1 "China Puts Brakes on High-Speed Trains" The Wall Street Journal 2011-04-17
- ↑ "China slows down showcase bullet trains" Bloomberg Businessweek 2011-04-17
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "The Backlash Is Brewing Against Chinese High-Speed Rail: Here's Why It's In Trouble" Business Insider 2011-04-17
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) "叫停津秦高铁跟刘志军落马无关" 齐鲁晚报 May 27, 2011
- ↑ (Chinese) "环保部叫停津秦铁路、胶济铁路两高铁建设运行" 新京报 2011-05-19
- ↑ (Chinese) Yan Weijue, "China not slowing high-speed rail construction" Chinadaily.com.cn June 7, 2011
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 61.0 61.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 'First Fatal Crash on Chinese High Speed Line,' Railway Gazette International, 25 July 201 http://www.railwaygazette.com/nc/news/single-view/view/first-fatal-crash-on-chinese-high-speed-line.html
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 'Decision to slow trains met with mixed response,'http://www.chinadaily.com.cn/cndy/2011-08/12/content_13097239.htm
- ↑ 'More high speed trains slow down to improve safety,'http://www.chinadaily.com.cn/china/2011-08/23/content_13167866.htm
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 82.0 82.1 82.2 82.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 83.0 83.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 84.0 84.1 84.2 (Chinese) "中国铁路建设大规模停工 建设重点出现调整" 2011-10-26
- ↑ (Chinese) "铁道部负债近2万亿 净资产收益率偏低" infzm.com 2011-07-19
- ↑ 86.0 86.1 86.2 86.3 (Chinese) "铁路建设9成缺钱停工 多地高铁项目拖欠工人工资停工" 中国经营网 2011-10-26
- ↑ (Chinese) "铁路工地一线直击:2700亿掀不起复工潮" 2011-12-14
- ↑ 市发改委:渝西高铁搁浅. 重庆到西安将借道西成高铁, Chongqing Ribao, 2012-09-28
- ↑ 89.0 89.1 (Chinese) "揭秘:贵广高铁如何穿越喀斯特" 南方都市报 2014-12-26
- ↑ (Chinese) 陈清浩, "贵广高铁正式开通运营 从贵阳到广州4小时可达" 南方日报 2014-12-26
- ↑ 91.0 91.1 91.2 Simon Rabinovitch, “China’s high-speed rail gets back on track” ‘’Financial Times’’ 2013-01-16
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 94.0 94.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 95.0 95.1 95.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 96.0 96.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "China's railways mileage tops 100,000 km" Xinhua 2013-12-28
- ↑ (Chinese)[中国高铁版图再扩容:兰新、贵广、南广高铁今日开通 中国新闻网 2014-12-26
- ↑ 99.0 99.1 99.2 (Chinese) "青荣城际今日通车 青烟威三城连心" 青岛新闻网 2014-12-28
- ↑ 100.0 100.1 (Chinese) "河南省首条城际铁路迎客运营 拉来‘双城生活’" 2014-12-29
- ↑ 101.0 101.1 (Chinese) 12月10日起铁路再调图 Xinhua 2014-11-15
- ↑ (Chinese) 7月1日全国铁路再调图 增开动车组列车53对 人民日报 2014-06-12
- ↑ 103.0 103.1 103.2 103.3 (Chinese) 发改委再批复两城市铁路规划 总投资超2000亿 中证网 2014-12-22
- ↑ (Chinese) 郑州-重庆万州高铁获批 中部再添开发主轴 2014-10-10
- ↑ (Chinese) 临沂至曲阜客运专线并轨京沪高铁获批 连云港至镇江高铁获批 预计2019年下半年通车 2014-11-07
- ↑ (Chinese) 临沂至曲阜客运专线并轨京沪高铁获批 2014-12-16
- ↑ (Chinese) 哈牡客运专线项目启动建设 打通亚欧国际货运大通道 2014-12-18
- ↑ (Chinese) 浙江11条城际铁路线昨日获批 2020年前将全部建成 2014-12-18
- ↑ "Chinese Trainmakers To Merge And Form Export Powerhouse" AFP 2014-12-03
- ↑ 110.0 110.1 110.2 110.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 111.0 111.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 112.0 112.1 112.2 112.3 China's amazing new bullet train CNN Money August 6, 2009
- ↑ Lua error in package.lua at line 80: module 'strict' not found. JournalistsResource.org, retrieved Feb. 20, 2014.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 115.0 115.1 115.2 115.3 115.4 115.5 115.6 (Chinese) "铁道部有意打包高铁资产 成立资产管理公司" 中财网[dead link] 2010-09-25
- ↑ Shelley Smith "Yuan Bond Sales Climb to Record Led by Railways: China Credit" Bloomberg 2010-10-13
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 135.0 135.1 135.2 135.3 135.4 135.5 135.6 (Chinese) "不计建设投资 京津高铁今年持平" 经济观察报 2010-09-18
- ↑ (Chinese) "京津城际高铁二线拟明年开工 或通过三河、香河、大厂" 2014-12-20
- ↑ 137.0 137.1 137.2 137.3 (Chinese) "4万公里快速铁路网冲刺" 21世纪经济报道 2010-09-30
- ↑ (Chinese) 火爆城际铁路的上座率考验 第一财经日报 2014-12-24
- ↑ (Chinese) 河南对城际铁路实行运营亏损补贴 补亏期暂定5年 河南日报 2014-12-11
- ↑ 140.0 140.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "去哪儿网 北京济南火车票" March 27, 2013
- ↑ "Why Acela" March 27, 2013
- ↑ 143.0 143.1 143.2 143.3 (Chinese) "高铁分流民航客源:多条短程航班停飞" infzm.com 2011-04-06
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ China starts work on Beijing-Shanghai express railway Xinhua 2008-04-18
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 154.0 154.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 162.0 162.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 166.0 166.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 宝鸡至兰州铁路客运专线建设项目启动, Xinhua, 2012-10-21
- ↑ 宝鸡至兰州客运专线陕西段工程开工建设, 2012-10-21
- ↑ 宝鸡至兰州的客运专线昨天在榆中奠基, 2012-10-27
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) "沪昆高铁南昌至杭州段正式开通运营" Xinhua 2014-12-10
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 180.0 180.1 180.2 180.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 183.0 183.1 (Chinese) 成贵高铁开工 2019年坐火车成都7小时到香港 成都商报 2013-12-26
- ↑ 184.0 184.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) 云桂铁路开工建设 December 27, 2010
- ↑ 吉林至珲春高铁将于2014年竣工通车 2013-02-20
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) "2020年快速铁路网将覆盖安徽 商合杭高铁力争早开工" 2012-10-11
- ↑ 南阳将搭上郑渝高铁 国家已立项有望15年开建 2014-03-06
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese)[http://news.xinhuanet.com/local/2014-12/26/c_1113791596.htm 连淮扬镇铁路客运专线开工建设 Xinhua] 2014-12-26
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "南(平)三(明)龙(岩)高铁动工" December 26, 2010
- ↑ 成兰铁路26日动工 建成后可2小时从成都到达九寨沟_资讯频道_凤凰网
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 209.0 209.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) 福州至平潭铁路工程开工建设 人民铁道报 2013-11-02
- ↑ (Chinese) 黔张常铁路(湘西段)建设工程开工(组图) 2014-12-29
- ↑ (Chinese) 青连铁路正式开工建设 2018年有望能通车 2014-12-29
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 217.0 217.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 227.0 227.1 (Chinese) 图文:武石武冈城际铁路昨日通车 楚天都市报讯 2014-06-19
- ↑ (Chinese) 武汉至十堰城际铁路力争年内开工 建成后全程仅2.5小时 2014-04-17
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) "成绵乐高铁 千呼万唤始出来" Gaotie.cn 2014-12-19
- ↑ 成蒲铁路建设正式启动_铁路建设
- ↑ (Chinese) 成蒲铁路大邑段全面开工 华西都市报 2014-06-05
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "High speed trains connecting Zhengzhou and Jiaozuo start operation" 2015-06-27
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 安庆宁安城际铁路长江大桥今年元旦前合龙(图)
- ↑ Nanjing – Anqing PDL opened
- ↑ (Chinese) 黑龙江省哈牡客专已开工 哈齐客专明年建成 2014-12-18
- ↑ 贵开城际铁路全线贯通 预计年底开通营运
- ↑ 贵开城际铁路全线贯通 预计年底开通营运
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 244.0 244.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) [哈尔滨至佳木斯铁路可行性研究报告通过批准] 2014-03-13
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) 牡丹江至哈尔滨铁路客运专线项目获国家批准 2014-03-10
- ↑ (Chinese)[2] 2010-10-16
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese)[3] 2010-09-25
- ↑ 259.0 259.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 273.0 273.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 286.0 286.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 293.0 293.1 [4][dead link]
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Shanghai Hongqiao Schedule(Chinese)
- ↑ 304.0 304.1 南京到西安可以乘动车了 去哈尔滨也有始发站列车 (One will be able to ride an EMU from Nanjing to Xi'an. There also will be a [Nanjing-originated] service to Harbin) 2012-12-14 (Chinese) (The planned Nanjing-Harbin service mentioned in the article will be "conventional", not high-speed)
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 309.0 309.1 309.2 309.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 316.0 316.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "Siemens joins China bid for Saudi Haramain project" March 24, 2010
- ↑ "China Is Eager to Bring High-Speed Rail Expertise to the U.S." N.Y. Times 2010-04-10
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Chinese Firm Constructs High-Speed Railway in Turkey 2014-01-18
- ↑ http://www.wsj.com/articles/china-to-design-new-russian-high-speed-railway-1434729400
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 337.0 337.1 (Chinese) "哈尔滨至武汉高铁今日开通 创世界最长高铁记录" 中新网 2014-12-10
Cite error: <ref>
tags exist for a group named "N", but no corresponding <references group="N"/>
tag was found, or a closing </ref>
is missing
- Pages with reference errors
- Pages with broken file links
- Articles containing simplified Chinese-language text
- Articles containing traditional Chinese-language text
- Articles with unsourced statements from December 2015
- Wikipedia articles needing clarification from June 2015
- Articles with unsourced statements from July 2011
- Articles with unsourced statements from February 2013
- Wikipedia articles needing clarification from March 2015
- Commons category link is locally defined
- Articles with Chinese-language external links
- Use dmy dates from December 2015
- High-speed rail in China
- Articles with dead external links from August 2011
- Articles with dead external links from October 2015