MRT Circle Line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

 14  MRT Circle Line
Circle Line
MRT Corp brand logo.png
Overview
Native name Laluan MRT Bulatan
Laluan Bulatan
Type Mass rapid transit (MRT)
System MRT - CBTC
Locale Orbital (Bandar Malaysia South - KL Eco City - Bukit Kiara - Sentul - Pandan)
Stations 68 (18 underground, 49 elevated, 1 at-grade)
Line number  14  (yellow)
Operation
Opened under feasibility study [1]
Owner Mass Rapid Transit Corporation (MRT Corp)
Rolling stock Siemens Inspiro
Technical
Line length 103.2 km (23 km underground, 80.2 km elevated) [2]
Track gauge Standard gauge
Route map
Sentul  2 
Sentul Timur  3  4 
Jalan Pahang
Semarak
Jelatek  5 
Jalan Ampang
Ampang Hill
Ampang  3 
Bandar Baru Ampang
Hospital Ampang
Taman Muda
Ampang Hill
Taman Bukit Mewah  10 
Taman Midah
Bandar Sri Permaisuri
Salak Selatan  4 
Bandar Malaysia South Kuala Lumpur–Singapore High Speed Rail  11 
Taman Desa
Kuchai Lama West
Eco City  2  5 
Bukit Kiara  10 
Bukit Damansara
Sri Hartamas
MATRADE

The MRT3 or Circle Line will be the third MRT line for Klang Valley Mass Rapid Transit Project and is currently under final planning and evaluation.[1] Announcement of alignment and station locations was expected during the second quarter of 2011. The Circle Line is expected to cover the hotspots surrounding the Bandar Malaysia, KL Ecocity, Bukit Kiara and Sentul.

The line is part of the Klang Valley Mass Rapid Transit Project.

When completed, the line will be one of the components of the Klang Valley Integrated Transit System.

Chronology

  • 05 February 2015 - Eyes now on MRT3. [2]

Rolling stock

Trains are expected to be four carriages long and have a standard of four doors per side per carriage, similar to the MRT1 rolling stock proposal.

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.

External links