Minnesota State Highway 25

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Trunk Highway 25 marker

Trunk Highway 25
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value).
Route information
Maintained by Mn/DOT
Length: 156.066 mi[2] (251.164 km)
Existed: 1920[1] – present
Major junctions
South end: US 169 at Belle Plaine
  MN 5 at Green Isle

US 212 at Norwood Young America
MN 7 near Mayer
US 12 at Montrose
MN 55 at Buffalo
I-94 at Monticello
US 10 at Big Lake
MN 23 at Foley

MN 27 at Pierz
North end: MN 210 at Brainerd
Location
Counties: Scott, Sibley, Carver, Wright, Sherburne, Benton, Morrison, Crow Wing
Highway system
  • Minnesota Trunk Highways
MN 24 MN 26

Minnesota State Highway 25 (MN 25) is a highway in Minnesota, which runs from its interchange with U.S. Highway 169 in Belle Plaine and continues north to its northern terminus at its intersection with State Highway 210 in Brainerd.

The route is 156 miles (251 km) in length.

Route description

State Highway 25 serves as a north–south route in central Minnesota between Belle Plaine, Norwood Young America, Watertown, Buffalo, Monticello, Big Lake, Becker, Foley, and Brainerd.

The route does run east–west between Belle Plaine and Green Isle for 15 miles.

Highway 25 crosses the Minnesota River at Belle Plaine.

The route crosses the Highway 25 Bridge at the Mississippi River between Monticello and Big Lake.

History

State Highway 25 was authorized in 1920 from Belle Plaine to Big Lake.[3]

The section of Highway 25 between U.S. Highway 10 (near Becker) and State Highway 18 (at Brainerd) was part of State Highway 218 until 1963.

At one time, the route had continued farther north. From 1963 to 2001, Highway 25 continued north of Brainerd. This northernmost segment between State Highway 210 and Merrifield was turned back to Crow Wing County maintenance in 2001[4] and is now designated County Road 3.[5]

Highway 25 was paved south of U.S. Highway 212 by 1940, the remainder of Highway 25 south of U.S. Highway 10 was paved by 1953.

Old State Highway 218 (now Highway 25) north of U.S. Highway 10 was paved by 1961.

Major intersections

County Location mi[2] km Destinations Notes
Scott Belle Plaine 0.000 0.000 US 169 Interchange
Minnesota River 2.008-2.120Error: mi is not a number Highway 25 Bridge
Sibley Green Isle 25.884 41.656 MN 5 South end of MN 5 overlap
Carver Young America Township 22.540 36.275 US 212 / MN 5 West end of US 212 overlap
Norwood Young America 24.874 40.031 US 212 / MN 5 East end of US 212 overlap
Young America Township 62.998 101.385 MN 5 North end of MN 5 overlap
Watertown Township 35.305-35.335Error: mi is not a number MN 7 Roundabout
Wright Montrose 48.383 77.865 US 12 West end of US 12 overlap
Rockford Township 50.481 81.241 US 12 East end of US 12 overlap
Buffalo 58.724 94.507 MN 55
Monticello 68.040 109.500 I-94 I-94 exit 193; interchange.
Mississippi River 68.722-68.912Error: mi is not a number Highway 25 Bridge
Sherburne Big Lake 71.753 115.475 US 10 East end of US 10 overlap
Becker 81.241 130.745 US 10 West end of US 10 overlap
Benton St. George Township 93.873 151.074 MN 95
Gilmanton Township 99.312 159.827 MN 23
Morrison Genola 128.230 206.366 MN 27 South end of MN 27 overlap
Buh Township 132.351 212.998 MN 27 North end of MN 27 overlap
Crow Wing Brainerd 155.751 250.657 MN 18
157.069 252.778 MN 210
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

Script error: No such module "Attached KML".

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.