Neuwied station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Neuwied
Deutsche Bahn
Through station
File:Bahnhof Neuwied.jpg
Location Neuwied, Rhineland-Palatinate
Germany
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Line(s)
Platforms 5
Other information
Station code 4464
DS100 code KNE[1]
IBNR 8000276
Category 3[2]
History
Opened 1869
Services
Preceding station   Deutsche Bahn   Following station
RE 8
Rhein-Erft-Express
toward Koblenz Hbf
RB 27
Rhein-Erft-Bahn
toward Koblenz Hbf
Preceding station   VIAS   Following station
Terminus SE 10
RheingauLinie

Neuwied station is, along with Engers station, a hub of public transport in the town of Neuwied in the German state of Rhineland-Palatinate and it is located in its west. The station is located on the East Rhine Railway (German: Rechte Rheinstrecke) and is the starting point of the Neuwied–Koblenz railway. In the station forecourt there is a bus station. The station is classified by Deutsche Bahn as a category 4 station.[2]

History

The station was opened in 1869, along with the East Rhine Railway. In the early years, especially after the opening of the Westerwald Railway in1884, Engers station was more important than Neuwied station. It was only after the construction of the Crown Prince Wilhelm bridge (the predecessor of today's Urmitz railway bridge) between Engers and Urmitz and the opening of the Neuwied–Koblenz railway in 1918 that the station became increasingly important, especially after the cessation of operations on the Westerwald Railway in the early 1990s.

When the West Rhine Railway was opened by the Rhenish Railway Company in 1857, there was a station called Neuwied in Weißenthurm.[3] The company operated a ferry between Neuwied and Weißenthurm from 1860.

Infrastructure

Neuwied station has a freight and a passenger area.

Freight yard

The Neuwied freight yard, which is operationally integrated into Neuwied station, has two loading tracks with a total of 1,827 square metres of roadway for loading. The loading of freight wagons can only be carried out on the loading road, using only one of the two electrified loading tracks.[4]

Passenger station

Passenger traffic is handled at Neuwied station on two platforms with four platform edges (three through tracks and a terminating track).

Neuwied station is being adapted for the disabled as part of the economic stimulus package. The middle platform has been raised to a height of 55 cm and lifts will be installed on the other two platforms to provide barrier-free access. In addition, the roof of platform 2/3 will be replaced to provide shelter for passengers and new furniture is being installed on the platform. According to Deutsche Bahn’s plans for 2011, the station is being equipped with a dynamic passenger information system and new platform lighting is being installed.[5]

In 2012, Neuwied station is served by only one long-distance service from 9 September to 21 October. This is also the only service that runs only on the east-bank line and not via Koblenz Central Station.

Line Route Period of operation
IC 2412[6] Frankfurt – Rüdesheim – Neuwied – Linz – Cologne – Düsseldorf – Duisburg – Essen – Münster –Bremen – Hamburg 9 September to 21 October 2012

In regional passenger transport, Neuwied station is served in the 2012 timetable by the following lines:

Line Line name Route Frequency
RE 8 Rhein-Erft-Express MönchengladbachRheydtCologneCologne/Bonn AirportBonn-BeuelLinz (Rhein)NeuwiedEngersKoblenz-EhrenbreitsteinKoblenz Hbf Hourly
SE 10 RheingauLinie NeuwiedKoblenz Stadtmitte – Koblenz Hbf – Rüdesheim (Rhein)WiesbadenFrankfurt (Main) Hourly
RB 27 Rhein-Erft-Bahn Mönchengladbach – Rheydt – Köln Hbf – Köln-Porz – Bonn-Beuel – Linz (Rhein) – NeuwiedKoblenz-Lützel – Koblenz Hbf Hourly

Outside the station

File:ZOB Nwd..JPG
The station forecourt, in the centre is the bus station, to the right is the community centre in the entrance building

The complete redesign of the station forecourt was carried out with a good appreciation of the station and its surroundings. This redesign included:[7]

  • the renewal and rebuilding of eleven bus bays (in addition, twelve bus parking spaces were provided)
  • the building of a parking area for bicycles
  • the creation of 100 park and ride spaces.

In addition, a community centre now occupies part of the station building.[8]

Notes

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />

References

  • Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
    • 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.