OGK-6
Lua error in Module:Infobox at line 314: malformed pattern (missing ']'). The Sixth Wholesale Power Market Generating Company JSC (OGK-6) was a Russian power generation company formed by merger of six generation companies.
History and operations
In 2006, the following 6 power plants were merged into one company:
- Novocherkassk GRES – 2,112 MW,
- Kirishi GRES – 2,100 MW
- Ryazan GRES – 2,650 MW
- Krasnoyarsk-2 GRES - 1,250 MW
- Cherepovets GRES - 630 MW
- GRES-24 - 310 MW (at Novomichurinsk; merged with Ryazan GRES in November 2008)
The installed capacity of all six thermal power plants was about 9,052 MW which made OGK-6 the fourth largest power company by installed capacity in Russia. The total installed heat of OGK-6 plants amounted to 2,704 Gcal/h. The power output of the OGK-6 power plants in 2007 was around 32.065 TWh.
OGK-6 shares were traded on MICEX and RTS.
In April 2010, it was announced that Gazprom, the major shareholder of OGK-2 and OGK-6, will merger OGK-6 into OGK-2 to create a single company with 10 power stations and a capacity of 17,750 MW.[1] The merger was completed by 1 November 2011.[2]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />