Toquop Energy Project is a proposed $1.4 billion energy facility located in Lincoln County near Mesquite, Nevada being built by Sithe Global Power. Phase 1 is a 100-megawatt (130,000 hp) photovoltaic plant scheduled for completion in 2012. Phase 2 of the project is a 700-megawatt (940,000 hp) natural gas station scheduled for completion in 2015.[1][2][3][4]