Ubungo I Thermal Power Station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Ubungo I Thermal Power Station
Ubungo I Thermal Power Station is located in Tanzania
Ubungo I Thermal Power Station
Map of Tanzania showing the location of Ubungo Thermal Power Station
Official name Ubungo I Thermal Power Station
Country Tanzania
Location Ubungo, Dar es Salaam
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Operational
Construction began 1994
Commission date 1995 (Oil)
2008 (Natural Gas)
Construction cost US$536 Million (2005)
Owner(s) TANESCO
Operator(s) Globeleq & Songas
Thermal power station
Primary fuel Natural Gas
Secondary fuel Heavy Oil
Power generation
Units operational 2 x 18.5 MW
2 x 37.5 MW
Make and model STAL (Oil)
General Electric (Gas)
Nameplate capacity 110 MW
File:Secretary Clinton Delivers Remarks at the Symbion Power Plant.jpg
Secretary Clinton Delivers Remarks at the Ubungo Power Plant in Tanzania

Ubungo I Thermal Power Station also known as the Ubungo Power Plant began commercial operations on 30 July 2008 with its Gas turbines. The power-plant is located in Ubungo, Dar es Salaam and has an installed capacity of 110 megawatts (150,000 hp).[1]

History

The Ubungo Power plant has existed since 1995 using turbines that run on Oil. Tanzania power supply is heavily dependent on Hydro power and after the drought in 2003-2005, the country faced major energy deficiency.[1]

Tanzania electric supply company decided to upgrade the turbines from Heavy Oil fuels to Natural gas. The company planned to obtain gas from the Songo Songo gas fields in southern Tanzania. Songas was given the contract to operate the powerplant and began commercial operations on 20 July 2004. Globeleq is the majoirty shareholder in Songas and operaters powerplants for up to 25% of the national energy supply. Globeleq spent US$260 million in setting up the songo songo gas-power project and currently the operator of the power plant.[2] A majoirty of that investment went into building a 225 km pipeline from Songo Songo island gas fields to Ubungo, Dar es Salaam.[3]

Construction of the pipeline network was completed in May 2004. The first gas reached Dar es Salaam in July 2004, and the project started commercial operation in July 2004[4]

Ubungo II

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

In July 2011, Siemens Energy secured an order from Jacobsen Elektro for three gas turbines to extend the Tanesco Ubungo power plant . The machines are also fueled from the Songo Songo gas field. The construction took 14 months and the new plant began operations in July 2012. This double the power output of the Ubungo Power plant project.[5][6]

See also

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.

External links