South African Class 19 4-8-2

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
South African Class 19 & 19R 4-8-2
300px
No. 1369 plinthed in Breyten, 11 June 2005
Type and origin
♠ Class 19 as built with a round-topped firebox
Class 19R rebuilt with a Watson Standard boiler
Power type Steam
Designer South African Railways
(Col F.R. Collins DSO)
Builder Berliner Maschinenbau
Serial number 9279-9282
Model Class 19
Build date 1928
Total produced 4
Specifications
Configuration 4-8-2 (Mountain)
Driver axle 2nd coupled axle
Gauge 3 ft 6 in (1,067 mm) Cape gauge
Leading dia Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
Coupled dia 54 in (1,372 mm)
Trailing dia 33 in (838 mm)
Tender wheels 34 in (864 mm)
Wheelbase Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
 • Engine 32 ft 2 in (9,804 mm)
 • Leading 6 ft 2 in (1,880 mm)
 • Coupled 14 ft 5 in (4,394 mm)
 • Tender 16 ft 9 in (5,105 mm)
 • Tender bogie 4 ft 7 in (1,397 mm)
Wheel spacing
(Assymetrical)
1-2: 4 ft 10 in (1,473 mm)
2-3: 4 ft 9 in (1,448 mm)
3-4: 4 ft 10 in (1,473 mm)
Length:
 • Over couplers
Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
Height ♠ 12 ft 10 in (3,912 mm)
Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
Frame type Bar
Axle load Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • Leading Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • 1st coupled Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • 2nd coupled Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • 3rd coupled Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • 4th coupled Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • Trailing Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • Tender bogie Bogie 1: Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Bogie 2: Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
 • Tender axle Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Adhesive weight Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Loco weight Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Tender weight Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Loco & tender weight Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Tender type MS (2-axle bogies)
MP, MP1, MR, MS, MX, MY, MY1 permitted
Fuel type Coal
Fuel capacity 11 LT (11.2 t)
Water cap Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Boiler Watson Standard no. 1A
 • Pitch 8 ft (2,438 mm)
 • Diameter 5 ft (1,524 mm)
 • Tube plates 20 ft 2 in (6,147 mm)
 • Small tubes 120: Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
76: Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
 • large tubes 21: Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
24: Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
 • Firebox type Round-top
Boiler pressure 200 psi (1,379 kPa)
Safety valve Pop
Firegrate area ♠ 37 sq ft (3.4 m2)
36 sq ft (3.3 m2)
Heating surface ♠ 2,176 sq ft (202.2 m2)
1,839 sq ft (170.8 m2)
 • Tubes ♠ 2,036 sq ft (189.2 m2)
1,700 sq ft (160 m2)
 • Firebox ♠ 127 sq ft (11.8 m2)
123 sq ft (11.4 m2)
Superheater:
 • Heating area
♠ 506 sq ft (47.009 m2)
404 sq ft (37.533 m2)
Cylinders Two
Cylinder size 21 in (533 mm) bore
26 in (660 mm) stroke
Valve gear Walschaerts
Valve type Piston
Couplers AAR knuckle
Performance figures
Tractive effort 31,850 lbf (141.7 kN) @ 75%
Career
Operators South African Railways
Class Class 19, 19R
Number in class 4
Numbers 1366–1369
Delivered 1928
First run 1928
Withdrawn 1977

The South African Railways Class 19 4-8-2 of 1928 was a steam locomotive.

In 1928, the South African Railways placed four Class 19 steam locomotives with a 4-8-2 Mountain type wheel arrangement in service. They were the forerunners of a family of light-rail branchline engines which would remain in service until the very end of the steam era. One of them was later reboilered with a Watson Standard boiler and reclassified to Class 19R.[1][2][3]

Manufacturer

File:Col F.R. Collins DSO.jpg
Col F.R. Collins DSO

Until 1928, the bulk of light 60 pounds per yard (30 kilograms per metre) branchline traffic on the South African Railways (SAR) was hauled by Classes 6, 7 and 8 locomotives. Due to the increase in traffic during the late 1920s, the need arose for a new and heavier type of branchline locomotive.[2]

At the request and under the direction of Colonel F.R. Collins DSO, Chief Mechanical Engineer (CME) of the SAR from 1922 to 1929, the basic design of the new Class 19 4-8-2 steam locomotive was done by Research and Test Engineer M.M. Loubser, himself later to be appointed as CME from 1939 to 1949. In 1928, four locomotives were built in Germany by Berliner Maschinenbau AG (BMAG), the former L. Schwartzkopff. They were delivered and placed in service during that same year.[2][3][4]

Characteristics

The locomotives, numbered in the range from 1366 to 1369, were in essence a lighter branchline development of the earlier Classes 15CB and 15CA heavy 4-8-2 mainline locomotives and proved to be extremely successful. They were approximately 50% more powerful than the Class 8 family and also had better speed with their larger diameter coupled wheels. They were superheated, built on bar frames and their piston valves were actuated by Walschaerts valve gear.[2][3][5]

A feature which was to be followed for all subsequent SAR locomotives, was their relatively large firegrate area of 37 square feet (3.4 square metres). The round-topped firebox had flexible stays fitted in the breaking zones. Three support brackets tied the boiler barrel to the main bar frames. As far as practicable, mountings were fixed to a steam stand on the firebox top and fitted with extensions to the spindles to carry the handles inside the cab, within easy reach of the enginemen.[2]

The cylinders drove on the second pair of coupled wheels. The locomotives were fitted with the single slide-bar type piston crossheads, popular in Europe but prone to rapid wear under South African conditions. The valve spindle crossheads were screwed to the ends of the valve spindles and secured with locknuts. Although this made adjustment easier, it was not satisfactory in service and was later replaced by the usual taper fit with cotter pin. With these two exceptions, the mechanical parts of the Class 19 gave very little trouble.[2]

Successors

Following the pilot project with only four Class 19 locomotives, four variants on the class were acquired over the next twenty-one years.[3][5]

The Class 19 family earned a reputation for reliability, easy handling, long periods between overhauls and economical operation. While preparing the specifications, Loubser gave considerable thought to the layout of this locomotive and the Research and Test Department was consulted on the most suitable wheel arrangement and other design details. The end result more than justified the amount of care and thought taken during the design process.[1][2]

Watson Standard boilers

From the 1930s, many serving locomotives were reboilered with a standard boiler type, designed by then CME A.G. Watson as part of his standardisation policy. Such Watson Standard reboilered locomotives were reclassified by adding an "R" suffix to their classification.[3][6][7]

In 1966, when Class 19 no. 1367 was reboilered with a Watson Standard no. 1A boiler, it became the sole Class 19R. The Watson Standard no. 1A boiler was designed to the same basic dimensions as the Class 19 boiler, but with more superheater elements, a different tube arrangement and larger diameter small tubes. In the process of reboilering, no. 1367 was also equipped with a Watson cab, with its distinctive inclined front, compared to the conventional vertical front of the original cab.[5][3][6][7]

While an obvious visual difference between an original and a Watson Standard reboilered locomotive is usually a rectangular regulator cover, just to the rear of the chimney on the reboilered locomotive, the slanted front of the new cab on no. 1367 served as an even more obvious identifying feature.[6][7]

Service

The four Class 19 locomotives were placed in service on the line between Kimberley and Vryburg, but they eventually spent their later working years at Empangeni and on the Bergville branch in Natal. By 1977, they were all withdrawn from service. One, the reboilered Class 19R no. 1367, was sold into industrial service in Natal and became the Platberg Colliery no. 2.[3][5]

Illustration

The last picture below shows the reboilered Class 19R no. 1367. Note the regulator cover to the rear of the chimney and the inclined front of the cab.

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 Espitalier, T.J.; Day, W.A.J. (1946). The Locomotive in South Africa - A Brief History of Railway Development. Chapter VII - South African Railways (Continued). South African Railways and Harbours Magazine, Jul 1946. pp. 541-543.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 Lua error in package.lua at line 80: module 'strict' not found.
  4. Information supplied by R.S. Loubser, son of M.M. Loubser
  5. 5.0 5.1 5.2 5.3 Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 6.2 South African Railways & Harbours/Suid Afrikaanse Spoorweë en Hawens (15 Aug 1941). Locomotive Diagram Book/Lokomotiefdiagramboek, 3'6" Gauge/Spoorwydte. SAR/SAS Mechanical Department/Werktuigkundige Dept. Drawing Office/Tekenkantoor, Pretoria. p. 45.
  7. 7.0 7.1 7.2 South African Railways & Harbours/Suid Afrikaanse Spoorweë en Hawens (15 Aug 1941). Locomotive Diagram Book/Lokomotiefdiagramboek, 2'0" & 3'6" Gauge/Spoorwydte, Steam Locomotives/Stoomlokomotiewe. SAR/SAS Mechanical Department/Werktuigkundige Dept. Drawing Office/Tekenkantoor, Pretoria. pp. 6a-7a, 26, 45.